BLD-Wall cover | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Brandon Shaw
|
|
|
Energy/ insulation...
|
BLD-Framing/Rough-in | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Brandon Shaw
|
|
|
David Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/1/2020 | | DONE |
|
|
|
all fees paid in May
|
BLD-Framing/Rough-in | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | FAIL |
Brandon Shaw
|
|
|
No city approved plans on site... Possible ADU...
|
OVERRIDE | | | 5/22/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 4/28/2020 | 4/28/2020 | 5/22/2020 | | PASS |
Josh Bogle
|
|
|
05/04 mod, ePlan - 1st done
|
Plan Reviewer's activity | | | 5/22/2020 | | DONE |
Josh Bogle
|
|
|
accepted resubmittal - contacted applicant about the missing engineering for the altered shear design
|
Routing - PLAN CHECK | 5/22/2020 | | 5/22/2020 | | PASS |
Josh Bogle
|
|
|
FEE PER ADDED VALUE
|
Permit Ready to Issue | | | 5/22/2020 | | DONE |
|
|
|
Plan Mod Approved
|
Routing - PLAN CHECK | 4/28/2020 | | 5/14/2020 | | FAIL |
Josh Bogle
|
|
|
failed, but kept in my queue in ePlan waiting for Energy Compliance info from David via e-mail
|
1st review completed | | | 5/14/2020 | | FAIL |
Josh Bogle
|
|
|
energy - IAQ - attic venting - fire separations
|
Routing - MECHANICAL | 4/29/2020 | | 4/29/2020 | | PASS |
Troy James
|
|
|
Submitted ACCA report for two ductless units. One in house and the other in garage.
|
Plan Modification Accepted | | | 4/28/2020 | | DONE |
|
|
|
Floor plan changes proposed, including new closet and 1/2 bath.
Originally submitted as paper, please stamp all ePlanReview files when approved
|
BLD-Wall Bracing | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | PASS |
Brandon Shaw
|
|
|
OK to cover exterior...
|
BLD-Footing | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Brandon Shaw
|
|
|
Gary Phone #: ###-####
|
BLD-Footing | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | CANC |
Brandon Shaw
|
|
|
Gary Phone #: ###-####
|
OVERRIDE | | | 11/19/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 11/14/2019 | 11/14/2019 | 11/19/2019 | | PASS |
Josh Bogle
|
|
|
11/20 garage, paper - 1st done
|
Telephone call | | | 11/19/2019 | | DONE |
|
|
|
called David and inform him that permit is ready to be picked up and gave him the fee amount due
|
Issue PAID IN FULL permit | | | 11/19/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 11/19/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/18/2019 | | 11/18/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/18/2019 | | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Routing - PLAN CHECK | 11/14/2019 | | 11/14/2019 | | FAIL |
Josh Bogle
|
|
|
needs lateral & uplift engineering at patio cover
|
1st review completed | | | 11/14/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 11/14/2019 | | | |
|
|
|
|