Permit Information
Permit NumberBLD19-04538
StatusFinaled
Name TK CONSTRUCTION & CONTRACTING LLC
Site Address 380 E PARKCENTER BLVD
Project NameLeavitt Ryan - Suite 300
Customer Number 
ePlanReviewYes
Description
**(LEAVITT RYAN – SUITE #300)** Permit is to remodel an existing 7,620 sq. ft. tenant space by dividing it into two separate tenant spaces, this tenant space is to be 3,674 sq. ft. and the remaining 3,677 sq. ft. is to be an unoccupied tenant space created under BLD19-04544. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, construction of select interior nonbearing wall to demise tenant spaces, select new interior nonbearing wall walls, select new door/door frames, millwork, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is fully Fire Sprinklered for one-hour substitution, with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice8/7/20208/7/20208/11/2020 DONE
DetailsBrandon Shaw
MAILED 8-14-2020
BLD-Final8/6/20208/7/20208/7/2020APASS
DetailsBrandon Shaw
Brandon,

Please give me a call when you are headed that way.

Thanks,

Todd Phone #: ###-#### Inspection requested via web by Todd Kurns
DOC - Permit Finaled8/7/20208/7/20208/7/2020PPASS
DetailsBrandon Shaw
BLD-Final3/20/20203/20/20203/20/2020PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Todd Kurns temp ok need card.
FIRE-Final Inspection3/18/20203/19/20203/19/2020PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work is complete, no signature card available at time of inspection.

Jim,

I have two fire extinguishers to hang. If I''m not there, set them where u would like to see them and I will hang them.

Thanks,

Todd Phone #: ###-#### Inspection requested via web by Todd Kurns
FIRE-Final Inspection3/18/20203/18/20203/18/2020PCANC
DetailsJim Page
Project related fire alarm permit needs to be finaled before life fire safety can be signed off, fire alarm inspection is schedule for 19MAR2020 per fire alarm vendor. This request is cancelled.

Phone #: ###-#### Inspection requested via web by Todd Kurns
Plan Reviewer's activity  1/7/2020 DONE
DetailsJavier Guzman
This project T.I. was updated in Tidemark with just changing the name from Bauer Law to new name Leavitt Ryan – Suite #300 the scope of work is remaining the same I just changed the name.
Telephone call  1/6/2020 DONE
left message to Todd to see if he recieved the permit (need signature) that was sent to his email, see activity 12/30/19
(F) Reprint permit  12/30/2019 DONE
Telephone call  12/30/2019  
emailed the reprint permit to tkurns23@gmail.com because when it was issued GC was not primary, please save to documents
Issue PAID IN FULL permit  12/6/2019 DONE
Print Occupancy Form  12/6/2019 DONE
Plan assigned to (JG)11/25/201911/25/201912/5/2019 PASS
DetailsJavier Guzman
1st rev comp, 11/27 L1 Bauer Law Suite 300 ePlan, pend flood
Routing - PLAN CHECK12/5/2019 12/5/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/5/2019 DONE
Permit Ready to Issue  12/5/2019 DONE
ALL MET -NEED
GC FORM
REVISED VALUE
Route to Impact Fee Review12/3/201912/6/201912/4/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing PW Flood Plain11/25/2019 12/3/2019 PASS
DetailsJason C. Taylor
LOMR 03-10-0215P .Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
1st review completed  12/3/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK11/25/2019 11/27/2019 FAIL
DetailsJavier Guzman
Routing - Addressing11/25/2019 11/25/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/25/2019 11/25/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Intake Approval  11/21/2019 PASS
DetailsJavier Guzman
Application received  11/15/2019 DONE
Application submitted via PDS Online on Nov 15 2019 12:10PM
Second Notice 8/21/2020