Permanent Occupancy | | | 1/6/2020 | | DONE |
|
|
|
|
BLD-Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Tell Riley
|
|
|
|
FIRE-Final Inspection | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire alarms, no fire sprinklers, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection is compklete, signature provided on permit sign off card.
DeeDee Phone #: ###-####
|
BLD-Final | 12/31/2019 | 1/2/2020 | 1/2/2020 | P | NR |
Tell Riley
|
|
|
Crystal Phone #: ###-####//will need CDHD signature and fire final completed//new counter is the only change to existing, minor plumbing and electrical changes completed and passed//
|
FIRE-Final Inspection | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | FAIL |
Troy Cobbley
|
|
|
Called contact but was unable to leave message since mail box was full. I drove to job site and found door locked and no access. No inspection performed. Crystal Phone #: ###-####
|
FIRE-Final Inspection | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | FAIL |
Jim Page
|
|
|
Service exit sign in back area, sign was not illuminated at time of inspection (south exit door). Provide annual inspection for fire extinguisher. Provide correct signage for main entry reading "Door to remain unlocked while space is occupied."
Zengdi Phone #: ###-####
|
BLD-Conference | 12/16/2019 | 12/23/2019 | 12/23/2019 | A | DONE |
Tell Riley
|
|
|
check on status of plan mod and other permits//talked with Carl W, owners met in office, needs to comply with plan review report for service area and counters//asked to schedule a conference//
|
BLD-Conference | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | CANC |
Tell Riley
|
|
|
check back on what is going on///
|
BLD-Conference | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | DONE |
Tell Riley
|
|
|
work going on inside--new service area, counters and service counters//may also require plumbing, mechanical and electrical permits//left correction notice//will check back in a week//talked with owner advised to submit plan mods for changes//
|
Issue PAID IN FULL permit | | | 11/25/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/15/2019 | | 11/22/2019 | | PASS |
Carl Westfall
|
|
|
occupancy (11/22/19)
|
Routing - PLAN CHECK | 11/15/2019 | | 11/22/2019 | | PASS |
Carl Westfall
|
|
|
|
1st review completed | | | 11/22/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/22/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/22/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2019 | | DONE |
|
|
|
Left a message for Zengdi informing him that this permit is ready and when he comes in one of us permit techs will go over the required inspections for occupancy
|
Recd Pcfee & Taken To Pln CK | | | 11/15/2019 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/15/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/15/2019 | | PASS |
|
|
|
|
First Notice | | 1/16/2020 | | | |
|
|
|
|
Application received | | 11/15/2019 | | | |
|
|
|
|