BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Brandon Shaw
|
|
|
Insulation...
|
BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Tony Young
|
|
|
SCREENED // Ed Phone #: ###-####
|
Telephone call | | | 7/22/2020 | | DONE |
|
|
|
contractor called. informed esc fees need to be paid too
|
CHANGE STATUS TO (ISS) | | | 7/22/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/21/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 7/21/2020 | | DONE |
|
|
|
plan mod approved
DO NOT RE ISSUE
|
Plan assigned to (CJW) | 6/18/2020 | 6/18/2020 | 7/20/2020 | | PASS |
Carl Westfall
|
|
|
plan mod - St. John's Preschool (routed to staff) Need ESC plan waiver letter
|
Plan Reviewer's activity | | | 7/20/2020 | | PASS |
|
|
|
Plan mod review approved
|
Routing - Erosion and Sediment | 7/8/2020 | | 7/16/2020 | | PASS |
Michael Zawacki
|
|
|
Waiver approved
|
Plan Reviewer's activity | | | 7/14/2020 | | DONE |
|
|
|
Sent Email to make sure ESC was aware
|
Routing - PLAN CHECK | 7/7/2020 | | 7/8/2020 | | PASS |
Carl Westfall
|
|
|
Plan mod review approved and drawings routed
|
Routing - Design Review | 7/8/2020 | | 7/8/2020 | | PASS |
Ted Vanegas
|
|
|
|
Plan Modification Accepted | | | 7/6/2020 | | DONE |
|
|
|
Workflow in ePlanReview received
|
Routing - PLAN CHECK | 7/6/2020 | | 7/6/2020 | | PASS |
Carl Westfall
|
|
|
Plan mod plan intake review approved
|
Plan Reviewer's activity | | | 6/22/2020 | | FAIL |
|
|
|
No revised drawins were uploaded. The workflow was sent back to the applicant so that revised drawings could be uploaded.
|
Plan Modification Accepted | | | 6/18/2020 | | DONE |
|
|
|
Wall between toilets shifted East. Sink in Restroom relocated on East plumbing wall. Service sink in Kitchen relocated to East wall.ADA ramp and patio extension to be concrete in lieu of trex type material originally specified.
|
Issue PAID IN FULL permit | | | 6/3/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/3/2020 | | DONE |
|
|
|
|
Extend Review Timeline | | | 5/6/2020 | | DONE |
|
|
|
1st Approved 180 day extenison Per Joe. See documents
|
Telephone call | | | 5/5/2020 | | DONE |
|
|
|
sent email to everyone about expiring permit
|
Plan assigned to (CJW) | 12/5/2019 | 12/30/2019 | 3/10/2020 | | PASS |
Carl Westfall
|
|
|
(1st done) 12/23/19 (L-3 - 15 days) (eplan - 5 sheets) St John's Preschool (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/10/2020 | | DONE |
|
|
|
ALL MET Edwin Johnston
GC Form
Revised Cert of Value
MET
ACHD
|
Routing - PLANNING | 3/5/2020 | | 3/9/2020 | | PASS |
Karla Nelson
|
|
|
Ok per CAA20-00006
|
Routing - PLAN CHECK | 3/3/2020 | | 3/5/2020 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 3/3/2020 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/26/2020 | | DONE |
|
|
|
|
Routing - PLANNING | 2/12/2020 | | 2/26/2020 | | FAIL |
Karla Nelson
|
|
|
Appeal periof for CAA20-00006 is over on March 2, 2020
|
Routing Off Site - C.D.H | 2/12/2020 | | 2/25/2020 | | PASS |
Carl Westfall
|
|
|
Matt McDonald ###-####
|
Routing - PLAN CHECK | 2/13/2020 | | 2/24/2020 | | PASS |
Carl Westfall
|
|
|
Revised drawings were received by Email and uploaded by the Plans Examiner. The drawings were approved after the resubmittal review.
|
Routing - Design Review | 2/12/2020 | | 2/18/2020 | | PASS |
Ted Vanegas
|
|
|
|
Routing Off Site - STRUCTURAL | 2/12/2020 | | 2/18/2020 | | PASS |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Routing - PUBLIC WORKS | 2/14/2020 | | 2/14/2020 | | PASS |
Candy A. Nichols
|
|
|
RESUBMITTAL-ADDING KIDS SINK
|
Routing - PLAN CHECK | 2/11/2020 | | 2/13/2020 | | FAIL |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 2/11/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/16/2020 | 1/19/2020 | 1/17/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan Reviewer's activity | | | 1/15/2020 | | DONE |
|
|
|
Called Will Renolds and encouraged him to just fail it so we can get workflow back to the applicant.
|
1st review completed | | | 1/15/2020 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 1/10/2020 | | 1/15/2020 | | FAIL |
Carl Westfall
|
|
|
This application was not originally sent to the CDHD. Will Renolds is the analyst.
|
Plan resubmittals requested | | | 1/14/2020 | | DONE |
|
|
|
Emailed the IBC plan review report to the applicant
|
Routing - PLAN CHECK | 12/5/2019 | | 1/14/2020 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 12/5/2019 | 12/5/2019 | 1/10/2020 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 12/5/2019 | | 12/16/2019 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Routing - PLANNING | 12/5/2019 | | 12/11/2019 | | FAIL |
David Moser
|
|
|
|
Routing - Addressing | 12/5/2019 | | 12/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/5/2019 | | 12/6/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 12/5/2019 | | 12/6/2019 | | PASS |
Ted Vanegas
|
|
|
|
Intake Approval | | | 12/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 11/25/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A1.0, A2.0 and G0.3 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on the cover sheet G0.1. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Provide structural engineering calculations for the complete design of the exterior deck/ramp to include footings, guards, attachments, etc.. the engineering calculations are required to be stamped, signed and dated by an Idaho licensed engineer.
|
Application received | | | 11/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 20 2019 2:08PM
|
BLD-Footing | 8/13/2020 | 8/14/2020 | | A | |
Tony Young
|
|
|
Ed - */Screened*/ Phone #: ###-####
|