Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-04624
StatusIssued
Name KRAFTWERK REMODEL INC
Site Address 815 W HAYS ST
Project NameSt John's Preschool
Customer Number 
ePlanReviewYes
Description
(ST. JOHN’S PRESCHOOL – CONVERSION FROM A DWELLING UNIT TO CHILDCARE PRESCHOOL) (DRH19-00467) (7-20-20 PLAN MODIFICATION TO SHIFT THE WALL BETWEEN THE TOILET ROOMS, TO RELOCATE A TOILET ROOM SINK, AND TO RELOCATE THE SERVICE SINK WITHIN THE KITCHEN. IN ADDITION, TO REPLACE THE FORMERLY PROPOSED WOOD DECK AT THE BACK DOOR WITH AN EXTERIOR CONCRETE PATIO. WORK INCLUDES CONCRETE RETAINING WALLS, FILL MATERIALS, A CONCRETE SLAB, CONCRETE RAMPS, A CONCRETE STAIRWAY, AND HANDRAILS. THE FLOOR AREA OF THE 1ST STORY IS ACTUALLY ABOUT 1,186 SQUARE FEET.) This building does not have a fire sprinkler system or a fire alarm system. To convert a former 1,239 square foot dwelling unit located on the 1st story of an existing 2 story building to a preschool for children. By order of the Building Official, the former 2nd story is not allowed to be occupied for any use including living, storage, office, meetings, or anything else. An existing garage located next to the alley will be demolished. The maximum number of children allowed by the Planning Division is 20. No food preparation or handling of food is allowed within this tenant space. Food items consumed on site will be pre-packaged/prepared off-site. Interior work includes a single-user toilet room accessible to the disabled per adult dimensions, a single-user toilet room accessible to the disabled per child dimensions, interior non bearing walls, millwork, and finishes. No bearing walls are allowed to be removed without providing adequate headers or beams to collect and transfer the loads. Exterior work includes a new concrete stairway with handrails and guards at the Hays Street porch and a new exterior deck, stairways, and accessible ramp in the back yard. Work includes concrete footing, wood beams, wood joists, composite wood decking, guards, and handrails. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in7/30/20207/31/20207/31/2020APASS
DetailsBrandon Shaw
Insulation...
BLD-Framing/Rough-in7/23/20207/23/20207/23/2020PPASS
DetailsTony Young
SCREENED // Ed Phone #: ###-####
Telephone call  7/22/2020 DONE
contractor called. informed esc fees need to be paid too
CHANGE STATUS TO (ISS)  7/22/2020 DONE
OVERRIDE  7/21/2020  
Permit Ready to Issue  7/21/2020 DONE
plan mod approved
DO NOT RE ISSUE
Plan assigned to (CJW)6/18/20206/18/20207/20/2020 PASS
DetailsCarl Westfall
plan mod - St. John's Preschool (routed to staff) Need ESC plan waiver letter
Plan Reviewer's activity  7/20/2020 PASS
Plan mod review approved
Routing - Erosion and Sediment7/8/2020 7/16/2020 PASS
DetailsMichael Zawacki
Waiver approved
Plan Reviewer's activity  7/14/2020 DONE
Sent Email to make sure ESC was aware
Routing - PLAN CHECK7/7/2020 7/8/2020 PASS
DetailsCarl Westfall
Plan mod review approved and drawings routed
Routing - Design Review7/8/2020 7/8/2020 PASS
DetailsTed Vanegas
Plan Modification Accepted  7/6/2020 DONE
Workflow in ePlanReview received
Routing - PLAN CHECK7/6/2020 7/6/2020 PASS
DetailsCarl Westfall
Plan mod plan intake review approved
Plan Reviewer's activity  6/22/2020 FAIL
No revised drawins were uploaded. The workflow was sent back to the applicant so that revised drawings could be uploaded.
Plan Modification Accepted  6/18/2020 DONE
Wall between toilets shifted East. Sink in Restroom relocated on East plumbing wall. Service sink in Kitchen relocated to East wall.ADA ramp and patio extension to be concrete in lieu of trex type material originally specified.
Issue PAID IN FULL permit  6/3/2020 DONE
Print Occupancy Form  6/3/2020 DONE
Extend Review Timeline  5/6/2020 DONE
1st Approved 180 day extenison Per Joe. See documents
Telephone call  5/5/2020 DONE
sent email to everyone about expiring permit
Plan assigned to (CJW)12/5/201912/30/20193/10/2020 PASS
DetailsCarl Westfall
(1st done) 12/23/19 (L-3 - 15 days) (eplan - 5 sheets) St John's Preschool (routed to staff)
PLANS/APPL TAKEN TO FRONT DESK  3/10/2020 DONE
Permit Ready to Issue  3/10/2020 DONE
ALL MET Edwin Johnston
GC Form
Revised Cert of Value

MET
ACHD
Routing - PLANNING3/5/2020 3/9/2020 PASS
DetailsKarla Nelson
Ok per CAA20-00006
Routing - PLAN CHECK3/3/2020 3/5/2020 PASS
DetailsCarl Westfall
Plan resubmittals received  3/3/2020 DONE
Plan resubmittals requested  2/26/2020 DONE
Routing - PLANNING2/12/2020 2/26/2020 FAIL
DetailsKarla Nelson
Appeal periof for CAA20-00006 is over on March 2, 2020
Routing Off Site - C.D.H2/12/2020 2/25/2020 PASS
DetailsCarl Westfall
Matt McDonald ###-####
Routing - PLAN CHECK2/13/2020 2/24/2020 PASS
DetailsCarl Westfall
Revised drawings were received by Email and uploaded by the Plans Examiner. The drawings were approved after the resubmittal review.
Routing - Design Review2/12/2020 2/18/2020 PASS
DetailsTed Vanegas
Routing Off Site - STRUCTURAL2/12/2020 2/18/2020 PASS
DetailsCarl Westfall
Dave Haugland (AHJ)
Routing - PUBLIC WORKS2/14/2020 2/14/2020 PASS
DetailsCandy A. Nichols
RESUBMITTAL-ADDING KIDS SINK
Routing - PLAN CHECK2/11/2020 2/13/2020 FAIL
DetailsCarl Westfall
Plan resubmittals received  2/11/2020 DONE
Route to Impact Fee Review1/16/20201/19/20201/17/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Plan Reviewer's activity  1/15/2020 DONE
Called Will Renolds and encouraged him to just fail it so we can get workflow back to the applicant.
1st review completed  1/15/2020 DONE
Routing Off Site - C.D.H1/10/2020 1/15/2020 FAIL
DetailsCarl Westfall
This application was not originally sent to the CDHD. Will Renolds is the analyst.
Plan resubmittals requested  1/14/2020 DONE
Emailed the IBC plan review report to the applicant
Routing - PLAN CHECK12/5/2019 1/14/2020 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - FIRE12/5/201912/5/20191/10/2020 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL12/5/2019 12/16/2019 FAIL
DetailsCarl Westfall
Dave Haugland (AHJ)
Routing - PLANNING12/5/2019 12/11/2019 FAIL
DetailsDavid Moser
Routing - Addressing12/5/2019 12/6/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/5/2019 12/6/2019 PASS
DetailsMorgan Webb
Routing - Design Review12/5/2019 12/6/2019 PASS
DetailsTed Vanegas
Intake Approval  12/3/2019 PASS
Intake Approval  11/25/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A1.0, A2.0 and G0.3 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on the cover sheet G0.1. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Provide structural engineering calculations for the complete design of the exterior deck/ramp to include footings, guards, attachments, etc.. the engineering calculations are required to be stamped, signed and dated by an Idaho licensed engineer.
Application received  11/20/2019 DONE
Application submitted via PDS Online on Nov 20 2019 2:08PM
BLD-Footing8/13/20208/14/2020 A 
DetailsTony Young
Ed - */Screened*/ Phone #: ###-####