BLD-Final | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
DOC - Permit Finaled | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | NH |
Brandon Shaw
|
|
|
Called as requested, no answer or call back
|
BLD-Final | 2/11/2020 | 2/12/2020 | 2/13/2020 | P | FAIL |
Brandon Shaw
|
|
|
R314 Smoke alarm... R315 Carbom detectors...
|
BLD-Framing/Rough-in | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PEND |
Brandon Shaw
|
|
|
Need Ele rough-in...
|
Meeting | | | 12/19/2019 | | DONE |
|
|
|
this was not change to the GC when issuing, corrected when scheduling inspection
|
Routing Walk-In (BLD) | 12/11/2019 | 12/11/2019 | 12/11/2019 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/11/2019 | | 12/11/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 12/11/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/11/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/11/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/21/2019 | 11/21/2019 | 11/21/2019 | A | FAIL |
Brian McGowan
|
|
|
Need more of the floor plan shown, section of how the closet will be built over the garage floor.
|
Routing - PLAN CHECK | 11/21/2019 | | 11/21/2019 | | FAIL |
Brian McGowan
|
|
|
Need more of the floor plan shown, section of how the closet will be built over the garage floor.
|
1st review completed | | | 11/21/2019 | | FAIL |
Brian McGowan
|
|
|
Need more of the floor plan shown, section of how the closet will be built over the garage floor.
|
Application received | | 11/21/2019 | | | |
|
|
|
|