BLD-Wall Bracing | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | PASS |
Mike Jordan
|
|
|
Screened- Kenny Phone #: ###-####
|
BLD-Wall Bracing | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | FAIL |
Mike Jordan
|
|
|
Kenny *screened Phone #: ###-####. Fasten all missed areas.
|
BLD-Other | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | PASS |
Mike Jordan
|
|
|
screened - fire wall // Kenny Phone #: ###-####
|
BLD-Concrete | 5/8/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Mike Jordan
|
|
|
rebar for slab -Shane Phone #: ###-#### *screened*
|
BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | CANC |
Mike Jordan
|
|
|
insulation // Kenny Phone #: ###-####
|
BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Mike Jordan
|
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD-Foundation | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 4/14/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Mike Jordan
|
|
|
*screened* Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/3/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/3/2020 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2020 | | DONE |
|
|
|
email permit to be signed to lj@sterlinghomes.us
|
Telephone call | | | 2/14/2020 | | DONE |
|
|
|
Contacted the GC and applicant to inform them not all the permits for the seven townhomes have been paid. Until all the fees have been paid, we can not issue the permits.
|
OVERRIDE | | | 2/13/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 12/6/2019 | 12/6/2019 | 2/13/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete: 12/12 L2 Town Home ePlan...12/11 Failed...02/04 Failed; Added Pergola which requires Engineering
|
Routing - PLAN CHECK | 2/13/2020 | | 2/13/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/13/2020 | | DONE |
|
|
|
MET
DO NOT ISSUE WITHOUT BLD19-04634,BLD19-04638, BLD19-04###-####8
|
Routing - PLAN CHECK | 2/4/2020 | | 2/4/2020 | | FAIL |
Rob Patrick
|
|
|
Added Pergola which requires Engineering.
|
Routing - PLANNING | 2/4/2020 | | 2/4/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 12/6/2019 | | 12/11/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 12/11/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Plan assigned to (BJM) | 11/22/2019 | 11/22/2019 | 12/6/2019 | | DEFR |
Brian McGowan
|
|
|
12/12- L2 Town Home ePlan
|
Route to Impact Fee Review | 11/22/2019 | 11/25/2019 | 11/25/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 11/22/2019 | | 11/25/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/22/2019 | | 11/25/2019 | | FAIL |
Katelyn Menuge
|
|
|
Provide exact layout and design of pergola, picnic tables and mailboxes, adjust the indicated landscape planter and provide a copy of the CC&R's stating the HOA will maintain the shared amenities located on the individual properties, such as the bicycle racks and shelter, and lamp posts. Provide a written letter from an Idaho Power distribution designer stating all structures meet clearance requirements from adjacent lines.
|
Routing - Addressing | 11/22/2019 | | 11/25/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/22/2019 | | 11/22/2019 | | PASS |
Candy A. Nichols
|
|
|
TOWNHOUSE
|
Intake Approval | | | 11/22/2019 | | PASS |
|
|
|
|
Application received | | 11/22/2019 | | | |
|
|
|
|