BLD-Aging Inspection | 7/22/2020 | 7/22/2020 | 7/22/2020 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Foundation | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Foundation | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Foundation | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | NR |
Brandon Shaw
|
|
|
Rebar-Jeff Phone #: ###-####
|
BLD-Footing | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 2/13/2020 | 2/13/2020 | 2/13/2020 | | DONE |
Melissa Jannusch
|
|
|
POOL RETAINING WALLA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 1/15/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/9/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 11/26/2019 | 11/26/2019 | 1/9/2020 | | PASS |
Josh Bogle
|
|
|
*12/02 pool, ePlan - 1st done
|
Routing PW Grading-Hillside | 1/9/2020 | | 1/9/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 1/9/2020 | | DONE |
|
|
|
ALl met
Need
RP
GC Form
|
Telephone call | | | 1/9/2020 | | DONE |
|
|
|
Emailed applicant to inform him we need the RP and GC form filled out before we can issue the permits.
|
Plan Reviewer's activity | | | 12/31/2019 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLAN CHECK | 12/18/2019 | | 12/30/2019 | | PASS |
Josh Bogle
|
|
|
passes, pending Hillside approval
|
Plan Reviewer's activity | | | 12/30/2019 | | DONE |
Josh Bogle
|
|
|
returned ePlan taks to applicant for Hillside corrections
|
Routing PW Grading-Hillside | 12/18/2019 | | 12/26/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan.
|
Routing - PLAN CHECK | 11/27/2019 | | 12/5/2019 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
1st review completed | | | 12/5/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 11/26/2019 | | 12/4/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing PW Grading-Hillside | 11/26/2019 | | 12/4/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 11/26/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/26/2019 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/26/2019 | | 11/26/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 11/26/2019 | | 11/26/2019 | | PASS |
Michael Zawacki
|
|
|
RP needed.
Site prep inspection required.
|
Application received | | | 11/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 22 2019 10:21AM
|