BLD-Energy code compliance | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Tony Young
|
|
|
Insulation Inspection. Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Dave Hannah
|
|
|
Framing Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | CANC |
Dave Hannah
|
|
|
Framing Inspection Phone #: ###-#### >> Inspection requested via web by Oleksiy Yanchuk Inspection cancelled from web by: Oleksiy Yanchuk
|
BLD-Framing/Rough-in | 3/23/2020 | 3/27/2020 | 3/27/2020 | A | PART |
Dave Hannah
|
|
|
Framing Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk soffits work in progresssheetrock ok rocking as they go
|
BLD-Wall Bracing | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PART |
Tony Young
|
|
|
shear wall inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk.. exterior ok after minor fixes
|
BLD-Foundation | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Tony Young
|
|
|
Edgar- wall foundation Phone #: ###-####// work in progress, ok
|
BLD-Footing | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Tony Young
|
|
|
Edgar Phone #: ###-####
|
PubWorks Subgrade Approval | 1/21/2020 | 1/21/2020 | 1/21/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
(F) Reprint permit | | | 1/14/2020 | | DONE |
|
|
|
|
Telephone call | | | 1/14/2020 | | DONE |
|
|
|
emailed connor construction a copy of the permit to sign and let them know if I don't get it back by the end of the day I will put a hold on the permit
|
Issue PAID IN FULL permit | | | 1/10/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/10/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 12/9/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 11/26/2019 | 11/26/2019 | 12/9/2019 | | DONE |
Jenny Nelson
|
|
|
12/13 sfd L2 ePlan
|
Routing - PLAN CHECK | 11/26/2019 | | 12/9/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 12/9/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 12/9/2019 | | DONE |
|
|
|
|
Routing - FIRE | 11/26/2019 | 11/26/2019 | 11/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
No Fire Sprinklers Required. MAS
|
Routing PW Grading-Hillside | 11/26/2019 | | 11/29/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 11/26/2019 | 11/29/2019 | 11/27/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 11/26/2019 | | 11/27/2019 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative approved. Valid RP listed. Site preparation inspection is required
|
Routing - MECHANICAL | 11/26/2019 | | 11/27/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 11/26/2019 | | 11/27/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 11/26/2019 | | 11/26/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/26/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/26/2019 | | PASS |
|
|
|
|
Routing - PLANNING | 11/26/2019 | | 11/26/2019 | | PASS |
Jeff Lowe
|
|
|
|
Application received | | | 11/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 22 2019 10:23AM
|