Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD19-04661
StatusIssued
Name CONNER CONSTRUCTION LLC
Site Address 3810 N SANDPOINT WAY
Project NameHolden Residence
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **310 SPECIAL INSPECTIONS** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2771 sq. ft., two story (first story 2098 sq. ft., second story 673 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 228 sq. ft. of covered patio/porch and a 847 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. JJN
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance4/17/20204/17/20204/17/2020PPASS
DetailsTony Young
Insulation Inspection. Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
BLD-Framing/Rough-in3/30/20203/31/20203/31/2020APASS
DetailsDave Hannah
Framing Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
BLD-Framing/Rough-in3/27/20203/30/20203/30/2020ACANC
DetailsDave Hannah
Framing Inspection Phone #: ###-#### >> Inspection requested via web by Oleksiy Yanchuk Inspection cancelled from web by: Oleksiy Yanchuk
BLD-Framing/Rough-in3/23/20203/27/20203/27/2020APART
DetailsDave Hannah
Framing Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk soffits work in progresssheetrock ok rocking as they go
BLD-Wall Bracing3/5/20203/6/20203/6/2020APART
DetailsTony Young
shear wall inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk.. exterior ok after minor fixes
BLD-Foundation1/23/20201/23/20201/23/2020PPART
DetailsTony Young
Edgar- wall foundation Phone #: ###-####// work in progress, ok
BLD-Footing1/21/20201/22/20201/22/2020APASS
DetailsTony Young
Edgar Phone #: ###-####
PubWorks Subgrade Approval1/21/20201/21/20201/21/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

(F) Reprint permit  1/14/2020 DONE
Telephone call  1/14/2020 DONE
emailed connor construction a copy of the permit to sign and let them know if I don't get it back by the end of the day I will put a hold on the permit
Issue PAID IN FULL permit  1/10/2020 DONE
Inspection Record Card- Bld  1/10/2020 DONE
OVERRIDE  12/9/2019  
Plan assigned to (J_N)11/26/201911/26/201912/9/2019 DONE
DetailsJenny Nelson
12/13 sfd L2 ePlan
Routing - PLAN CHECK11/26/2019 12/9/2019 PASS
DetailsJenny Nelson
1st review completed  12/9/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  12/9/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  12/9/2019 DONE
Routing - FIRE11/26/201911/26/201911/29/2019 PASS
DetailsMark Stumbaugh
No Fire Sprinklers Required. MAS
Routing PW Grading-Hillside11/26/2019 11/29/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Route to Impact Fee Review11/26/201911/29/201911/27/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment11/26/2019 11/27/2019 PASS
DetailsAndy J. Long
ESC site plan and narrative approved. Valid RP listed. Site preparation inspection is required
Routing - MECHANICAL11/26/2019 11/27/2019 PASS
DetailsTroy James
Routing - Addressing11/26/2019 11/27/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS11/26/2019 11/26/2019 PASS
DetailsCandy A. Nichols
Plans ACCEPTED BY PLAN TECH  11/26/2019 DONE
Recd Pcfee & Taken To Pln CK  11/26/2019 DONE
Intake Approval  11/26/2019 PASS
Routing - PLANNING11/26/2019 11/26/2019 PASS
DetailsJeff Lowe
Application received  11/22/2019 DONE
Application submitted via PDS Online on Nov 22 2019 10:23AM