Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04673
StatusIssued
Name RIM CREEK LLC
Site Address 8005 W FAIRVIEW AVE
Project NameExterior Remodel
Customer Number 
ePlanReviewYes
Description
(MILWAUKEE SHOPPING CENTER – EXTERIOR REMODEL) Permit is to remodel the exterior of an existing 11,515 sq. ft. building. Approval is contingent upon adhering to the approved plans on file and attached engineering. Work to include: removal of exterior framed canopy roof and soffit, removal of exterior canopy columns, removal of select exterior siding, select new canopy per design, select new exterior wall stone and stucco veneer and electrical work. Note: special inspection is required, see attached 310 form. This building is NOT Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/4/20206/5/20206/5/2020APEND
DetailsMike Jordan
call half hour before to meet // John Phone #: ###-####. Verified no electrical work was done that requiured a permit. Need special inspection for welding of new awnings or AISC cert. from fab shop.
BLD-Final6/2/20206/3/20206/3/2020ANR
DetailsMike Jordan
screened // John Phone #: ###-####. Needs to have overhead door removed from scope of work and plans. Also needs to resolve electrical permit requirement.
Issue PAID IN FULL permit  3/2/2020 DONE
Permit Ready to Issue  2/27/2020 DONE
MET
Need
GC Form
Revised Cert of Value
Plan assigned to (JG)1/7/20201/7/20202/26/2020 PASS
DetailsJavier Guzman
03/04 3rd rev L1 Fairview Exterior Remodel ePlan, pend eng
Routing - PLAN CHECK2/20/2020 2/26/2020 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL2/20/2020 2/26/2020 PASS
DetailsJavier Guzman
seigned off in ePlan by AHJ engineers
PLANS/APPL TAKEN TO FRONT DESK  2/26/2020 DONE
Routing Off Site - STRUCTURAL1/21/2020 2/10/2020 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ engineers
Routing - PLAN CHECK1/10/2020 1/21/2020 PASS
DetailsJavier Guzman
Routing - Design Review1/10/2020 1/10/2020 PASS
DetailsKatelyn Menuge
Route to Impact Fee Review1/8/20201/11/20201/9/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - Erosion and Sediment1/8/2020 1/8/2020 PASS
DetailsMichael Zawacki
Strip mall TI, no esc needed
1st review completed  1/8/2020 FAIL
DetailsJavier Guzman
Routing - Design Review1/7/2020 1/8/2020 PASS
DetailsKatelyn Menuge
DRH19-00430
Routing - PLAN CHECK1/7/2020 1/8/2020 FAIL
DetailsJavier Guzman
Routing - PUBLIC WORKS1/7/2020 1/7/2020 PASS
DetailsMorgan Webb
Routing PW Drainage1/7/2020 1/7/2020 PASS
DetailsBrian Murphy
Intake Approval  1/3/2020 PASS
DetailsJavier Guzman
Intake Approval  12/9/2019 FAIL
DetailsMichael Hanson
12/09/2019
Please upload all 10 pages of the #310 special inspection form with required boxes checked.
Intake Approval  12/2/2019 FAIL
DetailsMichael Hanson
Provide planning and zoning approval letter(s).
Provide completed #310 special inspections form completed, stamped, and signed.
Application received  11/22/2019 DONE
Application submitted via PDS Online on Nov 22 2019 4:21PM