Permit Information
Permit NumberBLD19-04686
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 5238 N CANDLESTICK AVE
Project NameSamantha Nelson PV
Customer Number 
ePlanReviewYes
Description
MODIFICATION - CHANGED PANEL MANUFACTURER 2/3/20 **jab** Permit for 280sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 16 panels in 2 arrays. No work needed to the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/11/20202/13/20202/13/2020PPASS
DetailsTell Riley
Please call ahead with a time frame. Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled2/13/20202/13/20202/13/2020PPASS
DetailsTell Riley
BLD-Framing/Rough-in2/7/20202/10/20202/10/2020ACANC
DetailsTell Riley
On site contact will be Jay Walters Phone #: ###-#### Inspection requested via web by BRS Permitting//no work needed to existing based on engineers evaluation//
CHANGE STATUS TO (ISS)  2/5/2020 DONE
plan mod approved
Plan assigned to (JAB) Josh1/24/20201/24/20202/3/2020 PASS
DetailsJosh Bogle
plan mod - 1st done
Routing - PLAN CHECK2/3/2020 2/3/2020 PASS
DetailsJosh Bogle
Permit Ready to Issue  2/3/2020 DONE
pan mod met
Routing - PLAN CHECK1/29/2020 1/29/2020 FAIL
DetailsJosh Bogle
panel specs not provided
Plan Modification Accepted  1/24/2020 DONE
plan mod requested by Hannah for a revised permit pack.
Routing - PLANNING1/24/2020 1/24/2020 PASS
DetailsJeff Lowe
BLD-Framing/Rough-in1/17/20201/22/20201/22/2020ACANC
DetailsTell Riley
Please call Mierins (###-####) before you head out to the inspection so we can coordinate. Thank you Phone #: ###-#### Inspection requested via web by BRS Permitting//framing is not required as no work will be completed to the existing structure//
Issue PAID IN FULL permit  11/27/2019 DONE
Plan assigned to (JAB) Josh11/25/201911/25/201911/26/2019 PASS
DetailsJosh Bogle
11/27 PV, ePlan
Routing - PLAN CHECK11/25/2019 11/26/2019 PASS
DetailsJosh Bogle
1st review completed  11/26/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/26/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  11/26/2019 DONE
Application received  11/25/2019 DONE
Application submitted via PDS Online on Nov 25 2019 3:14PM
Plans ACCEPTED BY PLAN TECH  11/25/2019 DONE
Intake Approval  11/25/2019 PASS
Recd Pcfee & Taken To Pln CK  11/25/2019 DONE
Routing - PLANNING11/25/2019 11/25/2019 PASS
DetailsJeff Lowe