Permit NumberBLD19-04695
StatusIssued
Name SPRINGER DALE L
Site Address 2121 W HAZEL ST
Project NameADU Springer
Customer NumberDRH19-00163
ePlanReviewNo
Description
Permit to build a 542sq' detached garage with a 451sq' Accessory Dwelling Unit above. Building replaces the previous garage. Heating/cooling via mini-split - Energy Code via Prescriptive. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in7/30/20207/30/20207/30/2020PPASS
DetailsTony Young
Dale - */Screened*/ Phone #: ###-####
BLD-Energy code compliance7/29/20207/30/20207/30/2020PPASS
DetailsTony Young
Tammy- */Screened*/ Phone #: ###-####
BLD-Framing/Rough-in7/29/20207/29/20207/29/2020PPART
DetailsTony Young
Tammy- */Screened*/ Phone #: ###-####// needs fire blocking at ceiling line
BLD-Framing/Rough-in7/27/20207/28/20207/28/2020PPASS
DetailsTony Young
SCREENED // Dale Phone #: ###-####
Telephone call  7/7/2020 DONE
Per attached letter from parcel owners, they are taking over as the permit holders.
BLD-Wall Bracing3/31/20203/31/20203/31/2020PPASS
DetailsMike Jordan
for shear inspection Phone #: ###-#### Inspection requested via web by greg bauer
BLD-Conference3/11/20203/12/20203/12/2020ADONE
DetailsDave Hannah
Regarding removing existing alley wall framing and replacing with new 2x6" wall with pressure treated sill plate. Phone #: ###-#### Inspection requested via web by greg bauer
BLD-Foundation2/25/20202/28/20202/28/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by greg bauer
BLD-Foundation2/24/20202/26/20202/26/2020PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by greg bauer
BLD-Foundation2/22/20202/24/20202/24/2020PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by greg bauer// footing for garage,/ ADU.. work in progress
Issue PAID IN FULL permit  1/10/2020 DONE
OVERRIDE  1/9/2020  
Telephone call  1/9/2020 DONE
Voicemail box is full. Emailed Greg to inform him the permit is ready, we need an RP and what fees are due.
Permit Ready to Issue  1/9/2020 DONE
NEED
RP
Plan assigned to (JAB) Josh11/26/201911/26/20191/8/2020 PASS
DetailsJosh Bogle
*12/02 ADU, paper - 1st done
Plan resubmittals received  1/8/2020 DONE
Two copies of each Cover sheet, site plan, permit set, elevations, building sections, electrical plan, general notes, typical structural, footings, upper floor framing, roof framing, S5, S5.01 plan and Engineering documents stamped and taken to plan reviewer.
Routing - PLAN CHECK1/8/2020 1/8/2020 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  1/8/2020 DONE
DetailsJosh Bogle
Case Summary (BLD)  1/8/2020 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  1/8/2020 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Routing - PLAN CHECK12/27/2019 12/27/2019 FAIL
DetailsJosh Bogle
see e-mails to Greg & Walter
Plan resubmittals requested  12/19/2019 DONE
Two copies of Enigineering, two copies of plan sheets 0.0,1.0, 2.0, 3.0, 4.0, 5.0, S0.00, S0.01, S1.00, S1.01, S1.02, S5.00 and S5.01 taken to Josh
1st review completed  12/5/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK12/4/2019 12/5/2019 FAIL
DetailsJosh Bogle
see e-mail to Greg
Routing - MECHANICAL  12/4/2019 PASS
DetailsTroy James
Ductless system for heating. Energy star bath fan for mechanical ventilation.
Routing - PLANNING11/27/2019 12/2/2019 FAIL
DetailsDavid Moser
Rear eave crosses property line and recorded deed restriction and conditions of approval, letter from Idaho Power
Routing - PLANNING12/2/2019 12/2/2019 PASS
DetailsTed Vanegas
Route to Impact Fee Review11/26/201911/29/201911/27/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - Addressing11/26/2019 11/27/2019 PASS
DetailsLaura Hunter
ADU address is: 2121 W Hazel St. Added fee
Routing - PUBLIC WORKS11/26/2019 11/27/2019 PASS
DetailsCandy A. Nichols
ADU
Plans ACCEPTED BY PLAN TECH  11/26/2019 DONE
Intake Approval  11/26/2019 PASS
Recd Pcfee & Taken To Pln CK  11/26/2019 DONE
Application received 11/26/2019