Permit Information
Permit NumberBLD19-04726
StatusIssued
Name CALDERA CAPITAL LLC
Site Address 1416 E BANNOCK ST
Project Name1416 E Bannock
Customer Number 
ePlanReviewYes
Description
***HOUSE MOVE*** Permit is for foundation, basement, and stairs only. The existing SFD was 1,850 sqft. New SFD will be 1,850 first floor and 1,850 finished basement with 8'-0" ceiling height. Separate permits required for mechanical, electrical, and plumbing. See approved plans and checklist. Structural engineering has beem provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing3/10/20203/11/20203/11/2020APASS
DetailsDave Hannah
Paul Phone #: ###-####
BLD-Conference3/2/20203/2/20203/3/2020PDONE
DetailsDave Hannah
Infrom contractor that property must be secured with fencing during basement construction. they will get a fench put up
BLD-Footing3/2/20203/3/20203/3/2020APASS
DetailsDave Hannah
joe Phone #: ###-####
Telephone call  3/2/2020 DONE
emailed applicant requesting proof of ownership of the parcel owner that is under an LLC
Issue PAID IN FULL permit  3/2/2020 DONE
Inspection Record Card- Bld  3/2/2020 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/28/2020 DONE
DetailsMichael Hanson
Permit Ready to Issue  2/28/2020 DONE
Need documentation confirming that the applicant is part of the Parcel Owner organization.
After checking with Tisha, this is not required
Plan assigned to (M_H)12/10/2019 2/28/2020 DONE
DetailsMichael Hanson
1st review completed - 12/23 #402 L1 ePlan - House Move
Routing - PLAN CHECK2/20/2020 2/20/2020 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Plan Reviewer's activity  2/20/2020 DONE
DetailsMichael Hanson
Discussed the requirements for structural engineering, stair details, damp-proofing, and emergency escape and rescue openings.
Routing - PLAN CHECK12/10/2019 12/23/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for corrections required.
1st review completed  12/23/2019 FAIL
DetailsMichael Hanson
Route to Impact Fee Review12/10/201912/13/201912/12/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - PLANNING12/12/2019 12/12/2019 PASS
DetailsDavid Moser
Routing - PUBLIC WORKS12/10/2019 12/11/2019 PASS
DetailsCandy A. Nichols
Routing PW Sewer Design12/10/2019 12/11/2019 PASS
DetailsDeAnn Brown
New home must connect to wet-line. Sewer is available in the alleyway.
Routing - MECHANICAL12/10/2019 12/10/2019 PASS
DetailsTroy James
No mechanical work shown. New mechanical equipment added during the remodel will require a manual j report.
Routing - PLANNING12/10/2019 12/10/2019 PASS
DetailsTed Vanegas
Routing - Addressing12/10/2019 12/10/2019 PASS
DetailsDoug Chausow
Intake Approval  12/10/2019 PASS
Passed prescreen per Michael Hanson
Intake Approval  12/4/2019 FAIL
Prescreen failed. Plan reviewer will be Michael Hansen, these are his prescreen comments. Please ask him if permit tech has any questions on the second prescreen.
a. Dimensions on the overall foundation length.
b. Dimensions on footing lengths.
c. Dimensions on stem wall thickness on 5’ detail.
d. Depth and construction of concrete slab.
e. Locations on the foundation floor plan demonstrating where each of the 3 different foundation types are to be used.
f. How and where are they attaching the home to the new foundation
g. How are the stairs built? Code compliant? Or how is basement accessed?
Application received  12/3/2019 DONE
Application submitted via PDS Online on Dec 3 2019 9:52AM