BLD-Footing | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | PASS |
Dave Hannah
|
|
|
Paul Phone #: ###-####
|
BLD-Conference | 3/2/2020 | 3/2/2020 | 3/3/2020 | P | DONE |
Dave Hannah
|
|
|
Infrom contractor that property must be secured with fencing during basement construction. they will get a fench put up
|
BLD-Footing | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
Telephone call | | | 3/2/2020 | | DONE |
|
|
|
emailed applicant requesting proof of ownership of the parcel owner that is under an LLC
|
Issue PAID IN FULL permit | | | 3/2/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2020 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 2/28/2020 | | DONE |
|
|
|
Need documentation confirming that the applicant is part of the Parcel Owner organization.
After checking with Tisha, this is not required
|
Plan assigned to (M_H) | 12/10/2019 | | 2/28/2020 | | DONE |
Michael Hanson
|
|
|
1st review completed - 12/23 #402 L1 ePlan - House Move
|
Routing - PLAN CHECK | 2/20/2020 | | 2/20/2020 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Plan Reviewer's activity | | | 2/20/2020 | | DONE |
Michael Hanson
|
|
|
Discussed the requirements for structural engineering, stair details, damp-proofing, and emergency escape and rescue openings.
|
Routing - PLAN CHECK | 12/10/2019 | | 12/23/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePlan for corrections required.
|
1st review completed | | | 12/23/2019 | | FAIL |
Michael Hanson
|
|
|
|
Route to Impact Fee Review | 12/10/2019 | 12/13/2019 | 12/12/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 12/12/2019 | | 12/12/2019 | | PASS |
David Moser
|
|
|
|
Routing - PUBLIC WORKS | 12/10/2019 | | 12/11/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing PW Sewer Design | 12/10/2019 | | 12/11/2019 | | PASS |
DeAnn Brown
|
|
|
New home must connect to wet-line. Sewer is available in the alleyway.
|
Routing - MECHANICAL | 12/10/2019 | | 12/10/2019 | | PASS |
Troy James
|
|
|
No mechanical work shown. New mechanical equipment added during the remodel will require a manual j report.
|
Routing - PLANNING | 12/10/2019 | | 12/10/2019 | | PASS |
Ted Vanegas
|
|
|
|
Routing - Addressing | 12/10/2019 | | 12/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 12/10/2019 | | PASS |
|
|
|
Passed prescreen per Michael Hanson
|
Intake Approval | | | 12/4/2019 | | FAIL |
|
|
|
Prescreen failed. Plan reviewer will be Michael Hansen, these are his prescreen comments. Please ask him if permit tech has any questions on the second prescreen.
a. Dimensions on the overall foundation length.
b. Dimensions on footing lengths.
c. Dimensions on stem wall thickness on 5’ detail.
d. Depth and construction of concrete slab.
e. Locations on the foundation floor plan demonstrating where each of the 3 different foundation types are to be used.
f. How and where are they attaching the home to the new foundation
g. How are the stairs built? Code compliant? Or how is basement accessed?
|
Application received | | | 12/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2019 9:52AM
|