BLD-Energy code compliance | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Mike Jordan
|
|
|
Trevor Phone #: ###-####. Letter from engineer provided accepting the garage portal frame construction.
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PEND |
Brandon Shaw
|
|
|
See wall brace entry...
|
BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | FAIL |
Brandon Shaw
|
|
|
No city approved plans on site... No air/ foam seal at time of inspection...
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | P | DEFR |
Jim Storey
|
|
|
Trevor Phone #: ###-#### out of time
|
BLD-Framing/Rough-in | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PART |
Brandon Shaw
|
|
|
Shear walls... As builts do not match Engineering pg, Simpson Strong Walls 12x9 to be approved by Engineer of record...
|
BLD-Foundation | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PART |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Footing | 1/10/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Jim Storey
|
|
|
dane Phone #: ###-####
|
BLD-Foundation | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
OVERRIDE | | | 1/9/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 12/17/2019 | 12/17/2019 | 1/9/2020 | | DONE |
Rob Patrick
|
|
|
01/03/20 Townhouse L2 ePlan...01/02 Failed...01/08 Failed
|
Issue PAID IN FULL permit | | | 1/9/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/9/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/9/2020 | | 1/9/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/9/2020 | | DONE |
|
|
|
Verify Parcel Owner will be GC and/or RP
|
Routing - PLAN CHECK | 1/8/2020 | | 1/8/2020 | | FAIL |
Rob Patrick
|
|
|
Need Energy Compliance.
|
1st review completed | | | 1/2/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 12/17/2019 | | 1/2/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLANNING | 12/17/2019 | | 1/2/2020 | | PASS |
Leon Letson
|
|
|
|
Routing - MECHANICAL | 12/17/2019 | | 12/26/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 12/17/2019 | 12/20/2019 | 12/18/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 12/17/2019 | | 12/17/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/17/2019 | | 12/17/2019 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR DEMO-TOWNHOUSE
|
Plans ACCEPTED BY PLAN TECH | | | 12/17/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/17/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/17/2019 | | PASS |
|
|
|
|
Intake Approval | | | 12/13/2019 | | FAIL |
|
|
|
Prescriptive method has to be declared in table form, preferably on the title page. Just listing the type of insulation used on the sections is not sufficient.
|
Intake Approval | | | 12/9/2019 | | FAIL |
|
|
|
No Manual J; No Energy Compliance
|
Application received | | | 12/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2019 11:35AM
|