BLD-Blower Door Test Results | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | DONE |
Tell Riley
|
|
|
2.71 ACH 50
|
BLD-Final | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Tell Riley
|
|
|
We''ve completed the door blast and relocated the carbon monoxide detector. Thanks, Phone #: ###-#### Inspection requested via web by Peter Harris//corrections made final completed//
|
DOC - Permit Finaled | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Tell Riley
|
|
|
corrections made final complete
|
BLD-Final | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | NR |
Tell Riley
|
|
|
House will be open. Cleaner will be be the only ones there tomorrow Phone #: ###-#### Inspection requested via web by Peter Harris//need blower door test//move combo smoke/co near master to 3 feet away from return duct//
|
BLD-Energy code compliance | 3/25/2020 | 3/27/2020 | 3/27/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Peter Harris
|
BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####
|
BLD-Wall Bracing | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####
|
BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Tell Riley
|
|
|
Brian Phone #: ###-####//wall ok//
|
BLD-Footing | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PART |
Tell Riley
|
|
|
Brian Phone #: ###-####//contractor is diging out frost areas and heating with torches onsite//WIP with frost//pour at own risk if frost is not completly removed//areas outside of shade ground temps ok and no frost//
|
BLD-Footing | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | FAIL |
Tell Riley
|
|
|
Brian Phone #: ###-####//1/2 of footings subgrade frozen//
|
Telephone call | | | 2/4/2020 | | DONE |
|
|
|
Emailed Peter to inform him not all of the fees for this project have been paid. Once the remaining fees have been paid we then can issue the permits.
|
Issue PAID IN FULL permit | | | 2/4/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/9/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 12/16/2019 | 12/16/2019 | 1/9/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 1/9/2020 | | 1/9/2020 | | PASS |
Sue Cummings
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 1/9/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/8/2020 | | 1/8/2020 | | PASS |
Jenny Nelson
|
|
|
Per D_S review
|
Routing - FIRE | 12/16/2019 | 12/16/2019 | 12/17/2019 | | PASS |
Lee G Meredith
|
|
|
New SFH
Sprinklers are not required.
|
1st review completed | | | 12/17/2019 | | FAIL |
Debbie Sanine
|
|
|
|
Plan assigned to (BJM) | 12/5/2019 | 12/5/2019 | 12/16/2019 | | DEFR |
Brian McGowan
|
|
|
12/18- SFD L1
|
Routing - PLAN CHECK | 12/5/2019 | | 12/16/2019 | | FAIL |
Jenny Nelson
|
|
|
Per D_S review
|
Route to Impact Fee Review | 12/5/2019 | 12/8/2019 | 12/6/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 12/5/2019 | | 12/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/5/2019 | | 12/5/2019 | | FAIL |
Sue Cummings
|
|
|
Need to see driveway location and width.
|
Routing - Addressing | 12/5/2019 | | 12/5/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/5/2019 | | 12/5/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/5/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/5/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/5/2019 | | PASS |
|
|
|
|
Application received | | | 12/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 4 2019 11:25AM
|