BLD-Aging Inspection | 5/26/2020 | 5/26/2020 | 5/26/2020 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Foundation | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | PASS |
Jim Storey
|
|
|
rebar // John Phone #: ###-####
|
BLD-Footing | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Footing | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PART |
Tell Riley
|
|
|
Shawn Phone #: ###-####//interior footings ok per engineering//
|
BLD-Footing | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | PART |
Jim Storey
|
|
|
John Phone #: ###-#### ft ok east and south ft ok to place
|
OVERRIDE | | | 12/6/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/6/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/6/2019 | | 12/6/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/6/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/6/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 12/6/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Ethan Mansfield
|
|
|
No ADU allowed with this permit.
No kitchen allowed.
|
Routing Walk-In (BLD) | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/4/2019 | | 12/4/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 12/4/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 12/4/2019 | | | |
|
|
|
|