Second Notice | | 3/15/2020 | 3/12/2020 | | DONE |
|
|
|
This permit finaled on the web by Mysti Stelluto
|
First Notice | | 2/9/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Permanent Occupancy | | | 1/30/2020 | | DONE |
|
|
|
|
BLD-Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Tell Riley
|
|
|
Ben Covert Phone #: ###-####//trades ok//final complete per plans//
|
FIRE-Final Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Ben Covert Phone #: ###-####
|
BLD-Conference | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | DONE |
Mike Jordan
|
|
|
ben Phone #: ###-####. Will be ok for final once fire/life/safety finals.
|
FIRE-Final Inspection | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the fire sprinkler permit has been inspected/finaled.
Ben Phone #: ###-####
|
BLD-Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | NR |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
FIRE-Final Inspection | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm panel needs to be cleaned up, fire sprinkler permit needed for modifications, new door hardware to be single action type, repair exit signs and emergency lights.
Ben Phone #: ###-####
|
BLD-Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | NR |
Jim Storey
|
|
|
Ben Phone #: ###-#### need sign offs
|
BLD-Framing/Rough-in | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PART |
Mike Jordan
|
|
|
call for access - ben Phone #: ###-####. Interior wood framed walls ok. Contractor to get RFI from engineer of record to approve the use of 2x4 in leiu of 2x6 wood studs for neww beam support.
|
Telephone call | | | 12/20/2019 | | DONE |
|
|
|
emailed Mysti to let her know that the fees were assessed incorrectly. She will have to request a refund on this permit.
|
Issue PAID IN FULL permit | | | 12/20/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/20/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 12/17/2019 | 12/17/2019 | 12/18/2019 | | PASS |
Javier Guzman
|
|
|
12/19 L1 ICOA ePlan
|
Routing - Design Review | 12/17/2019 | | 12/18/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00454. Landscaping to fully screen A/C units.
|
Routing - PLAN CHECK | 12/17/2019 | | 12/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 12/17/2019 | | 12/18/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING.
|
1st review completed | | | 12/18/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/18/2019 | | DONE |
|
|
|
met:
Need GC and Cert of value split for BLD19-04769 & BLD19-04869
|
Routing - MECHANICAL | 12/17/2019 | | 12/17/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 12/17/2019 | | 12/17/2019 | | PASS |
Doug Chausow
|
|
|
Suite 110
|
Intake Approval | | | 12/13/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 12/11/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A1.0, A2.0 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Provide a completed 518 application for the created tenant space tenant space on the right since this was a single tenant previously
• Provide the engineering calculations for the removal and header placement at the interior entry bearing wall, the engineering is required to be stamped, signed and dated by an Idaho licensed engineer
|
Application received | | | 12/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 6 2019 1:44PM
|