Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD19-04772
StatusIssued
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 8167 W TUDOR LN
Project NameLot 17- Unit C
Customer NumberEPLAN BLD19-04767,BLD19-04770,72,73
ePlanReview 
Description
***04/13/20 PLAN MODIFICATION to update girder structural support at common wall *** (FOUR PERMITS FILED UNDER BLD19-04767) Permit for the construction of a new 2105 sq. ft., 3 story (first story 339 sq. ft., second story 972 sq. ft. and third story 794 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 438 sq. ft. of covered patio/porch and a 740 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. C-1D zoning and setbacks per planning. ***RDP**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/12/20208/12/20208/12/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to start cover, will need to see around beams and 2 hr wall in location that need extended to roof deck//
BLD-Wall cover8/10/20208/10/20208/10/2020PPASS
DetailsTell Riley
Partywall shear Phone #: ###-#### Inspection requested via web by Shane Shade
BLD-Energy code compliance7/28/20207/28/20207/28/2020APART
DetailsTell Riley
Final Framing/Energy Phone #: ###-#### Inspection requested via web by Shane Shade//minor corrections, ok to hang separation wall will need to check for shear nailing//
BLD-Framing/Rough-in7/23/20207/23/20207/23/2020PPART
DetailsTell Riley
framing/foam seal Phone #: ###-#### Inspection requested via web by Shane Shade//see Crystal and Shane onsite for list of corrections//ok to insulate in areas not affected by corrections//
BLD-Framing/Rough-in7/20/20207/20/20207/21/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to air seal 2 hr walls, insulate//ok to air seal and insulate front and rear walls that require OSB sheathing on inside//add anchor bolts and/or nuts//
BLD-Framing/Rough-in7/13/20207/13/20207/13/2020APART
DetailsTell Riley
Tr,uss/consultation Phone #: ###-#### Inspection requested via web by Shane Shade//truss bracing ok//provide engineering for mechanical added to attic space//
BLD-Framing/Rough-in7/9/20207/9/20207/9/2020PNR
DetailsTell Riley
Truss Phone #: ###-#### Inspection requested via web by Shane Shade//need to add truss bracing and nail hangers//
Routing - MECHANICAL6/29/2020 6/29/2020 PASS
DetailsTroy James
Resubmitted manual j
BLD-Wall Bracing6/12/20206/12/20206/12/2020APART
DetailsTell Riley
Final shear Phone #: ###-#### Inspection requested via web by Shane Shade//Exterior nailing and strapping//need to add straping above windows and at sill plates per type 3 shear details//add nails as dicussed--shane will verify prior to covering with wrap//
BLD-Wall Bracing6/8/20206/8/20206/8/2020APART
DetailsTell Riley
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
BLD-Wall Bracing6/4/20206/4/20206/4/2020APART
DetailsTell Riley
//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
CHANGE STATUS TO (ISS)  6/4/2020 DONE
Plan assigned to (RDP)4/8/20204/8/20204/13/2020 DONE
DetailsRob Patrick
plan mod
Routing - PLAN CHECK4/13/2020 4/13/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  4/13/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  4/13/2020 DONE
Plan Mod Met
Plan Modification Accepted  4/8/2020 DONE
Pamela Gaines from NeuDesign requested a plan mod workflow started to upload truss information.
BLD-Concrete4/2/20204/2/20204/2/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//vapor barrier and insulation ok//
BLD-Concrete4/2/20204/2/20204/2/2020ACANC
DetailsTell Riley
Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
BLD-Foundation3/16/20203/17/20203/17/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade
BLD-Foundation3/13/20203/16/20203/16/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade
BLD-Foundation3/12/20203/13/20203/13/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade
BLD-Footing3/9/20203/10/20203/10/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade
Issue PAID IN FULL permit  2/6/2020 DONE
Inspection Record Card- Bld  2/6/2020 DONE
Telephone call  2/4/2020 DONE
emailed applicant and GC to inform them that not all four townhomes fees have been paid and that we need all four permits to be paid for before we can issue the permits.
OVERRIDE  2/3/2020  
Plan assigned to (RDP)12/30/201912/30/20192/3/2020 DONE
DetailsRob Patrick
01/16 Townhouse L2 ePlan...01/10 Failed...01/28 Passed; waiting for Planning and DR to review.
Routing - PLANNING2/3/2020 2/3/2020 PASS
DetailsLeon Letson
PLANS/APPL TAKEN TO FRONT DESK  2/3/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  2/3/2020 DONE
Routing - Design Review1/28/2020 1/28/2020 PASS
DetailsKatelyn Menuge
Routing - PLAN CHECK1/28/2020 1/28/2020 PASS
DetailsRob Patrick
Waiting for Planning and DR to review
1st review completed  1/10/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLAN CHECK  1/10/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLANNING  1/9/2020 FAIL
Comply with DR request for revisions.
Routing - Design Review1/2/2020 1/3/2020 FAIL
DetailsKatelyn Menuge
Design Review can't approve railing changes. Revert to previous design or provide a more contiguous look.
Routing - MECHANICAL  1/3/2020 PASS
Route to Impact Fee Review12/31/20191/3/20201/2/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - Addressing12/31/2019 1/2/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  1/2/2020 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT
Telephone call  12/30/2019 DONE
Contacted Pam to inform her that not all the plan check fees have been paid. Once the other three have been paid we can route for review.
Intake Approval  12/30/2019 PASS
Intake Approval  12/20/2019 FAIL
2 of the 4 manual J's did not load properly in ePlan.
Intake Approval  12/10/2019 FAIL
Per email, please upload Manual J's for all four addresses with the addresses listed on the document.
Telephone call  12/6/2019 DONE
Spoke with Pamela about how to apply for townhomes that are connected. Informed her to upload an application and manual J for lot 17 and 18 and resubmit for prescreen.
Lot 15 and 16 are uploaded correctly.
Please let Tiffany know when the prescreen comes in.
Application received 12/6/2019