BLD-Framing/Rough-in | 8/12/2020 | 8/12/2020 | 8/12/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to start cover, will need to see around beams and 2 hr wall in location that need extended to roof deck//
|
BLD-Wall cover | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Tell Riley
|
|
|
Partywall shear Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Energy code compliance | 7/28/2020 | 7/28/2020 | 7/28/2020 | A | PART |
Tell Riley
|
|
|
Final Framing/ Energy
Please call 30 minutes prior Phone #: ###-#### Inspection requested via web by Shane Shade//minor corrections, ok to hang separation wall will need to check for shear nailing//
|
BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PART |
Tell Riley
|
|
|
framing/foam seal Phone #: ###-#### Inspection requested via web by Shane Shade//see Crystal and Shane onsite for list of corrections//ok to insulate in areas not affected by corrections//
|
BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/21/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to air seal 2 hr walls, insulate//ok to air seal and insulate front and rear walls that require OSB sheathing on inside//add anchor bolts and/or nuts//
|
BLD-Framing/Rough-in | 7/13/2020 | 7/13/2020 | 7/13/2020 | A | PART |
Tell Riley
|
|
|
Truss/Consultation Phone #: ###-#### Inspection requested via web by Shane Shade//truss bracing ok//provide engineering for mechanical added to attic space//
|
BLD-Framing/Rough-in | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PART |
Tell Riley
|
|
|
Truss Phone #: ###-#### Inspection requested via web by Shane Shade//truss bracing installed//nail all truss hangers//
|
Routing - MECHANICAL | 6/29/2020 | | 6/29/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j
|
BLD-Wall Bracing | 6/12/2020 | 6/12/2020 | 6/12/2020 | A | PART |
Tell Riley
|
|
|
Final shear Phone #: ###-#### Inspection requested via web by Shane Shade//Exterior nailing and strapping//need to add straping above windows and at sill plates per type 3 shear details//add nails as dicussed--shane will verify prior to covering with wrap//
|
BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 | A | PART |
Tell Riley
|
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 | A | PART |
Tell Riley
|
|
|
//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
CHANGE STATUS TO (ISS) | | | 6/4/2020 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 4/8/2020 | 4/8/2020 | 4/13/2020 | | DONE |
Rob Patrick
|
|
|
plan mod
|
Routing - PLAN CHECK | 4/13/2020 | | 4/13/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/13/2020 | | DONE |
|
|
|
Plan mod Met
|
Plan Modification Accepted | | | 4/8/2020 | | DONE |
|
|
|
Pamela Gaines from NeuDesign requested a plan mod workflow started to upload truss information.
|
BLD-Concrete | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//vapor barrier and insulation ok//
|
BLD-Concrete | 4/2/2020 | 4/2/2020 | 4/2/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
|
BLD-Foundation | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Foundation | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Foundation | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Conference | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | CANC |
Tell Riley
|
|
|
We need the initial grading inspection done for excavation to start. Phone #: ###-#### Inspection requested via web by Ed Kron
|
Issue PAID IN FULL permit | | | 2/6/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/4/2020 | | DONE |
|
|
|
emailed applicant and GC to inform them that not all four townhomes fees have been paid and that we need all four permits to be paid for before we can issue the permits.
|
OVERRIDE | | | 2/3/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 12/30/2019 | 12/30/2019 | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
01/16 Townhouse L2 ePlan...01/10 Failed...01/28 Passed; waiting for Planning and DR to review.
|
Routing - PLANNING | 2/3/2020 | | 2/3/2020 | | PASS |
Leon Letson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/3/2020 | | DONE |
|
|
|
ISSUE ALL TOGETHER BLD1-04767, BLD19-04770,BLD17-04772 and BLD19-04773
|
Routing - Design Review | 1/28/2020 | | 1/28/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 1/28/2020 | | 1/28/2020 | | PASS |
Rob Patrick
|
|
|
Waiting for Planning and DR to review
|
1st review completed | | | 1/10/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | | | 1/10/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLANNING | | | 1/9/2020 | | FAIL |
|
|
|
Comply with DR request for revisions.
|
Routing - Design Review | 1/2/2020 | | 1/3/2020 | | FAIL |
Katelyn Menuge
|
|
|
Design Review can't approve railing changes. Revert to previous design or provide a more contiguous look.
|
Routing - MECHANICAL | | | 1/3/2020 | | PASS |
|
|
|
|
Route to Impact Fee Review | 12/31/2019 | 1/3/2020 | 1/2/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 12/31/2019 | | 1/2/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 1/2/2020 | | PASS |
Morgan Webb
|
|
|
CONTACT WEST BOISE SEWER DISTRICT
|
Telephone call | | | 12/30/2019 | | DONE |
|
|
|
Contacted Pam to inform her that not all the plan check fees have been paid. Once the other three have been paid we can route for review.
|
Intake Approval | | | 12/30/2019 | | PASS |
|
|
|
|
Intake Approval | | | 12/20/2019 | | FAIL |
|
|
|
2 of the 4 manual J's did not load properly in ePlan.
|
Intake Approval | | | 12/10/2019 | | FAIL |
|
|
|
Per email, please upload Manual J's for all four addresses with the addresses listed on the document.
|
Telephone call | | | 12/6/2019 | | DONE |
|
|
|
Spoke with Pamela about how to apply for townhomes that are connected. Informed her to upload an application and manual J for lot 17 and 18 and resubmit for prescreen.
Lot 15 and 16 are uploaded correctly.
Please let Tiffany know when the prescreen comes in.
|
Application received | | 12/6/2019 | | | |
|
|
|
|