Permit NumberBLD19-04781
StatusIssued
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 3077 E BARBER VALLEY DR
Project NameBarber Valley Urgent Care
Customer Number 
ePlanReviewYes
Description
(BARBER VALLEY URGENT CARE) (DRH19-00097) // 06/18/20 PLAN MOD TO RELOCATE BUILDING 14 FT SOUTH. JAR // Permit to construct a new 5,375 sq ft medical clinic building. Work to include: construction of concrete spread footings and ground floor slab; wood framed exterior walls and wood truss roof; exterior windows and doors; electrical lighting and power; mechanical roof top units and ductwork; plumbing. Envelope, lighting, and mechanical in compliance with the 2015 IECC. All work shall comply with the approved drawings, the plan review report, and all applicable codes. Special Inspections required per the attached Form 310. This building is NOT fire sprinklered. The building will have a fire alarm system, which requires a separate permit and shall be installed per NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation7/31/20208/3/20208/3/2020APART
DetailsBrandon Shaw
Work in progress...
Pending special inspection...
BLD-Footing7/27/20207/28/20207/28/2020APART
DetailsBrandon Shaw
Speciakl inspector to be on site for rebar and concrete pour...
CHANGE STATUS TO (ISS)  7/1/2020 DONE
OVERRIDE  6/30/2020  
Plan assigned to (JAR)6/9/20206/9/20206/30/2020 DONE
DetailsJulie Romig
07/02 - 2nd Rev - 1st Rev Comp - Plan Mod Barber Valley Urgent Care
Routing PW Drainage6/26/2020 6/30/2020 PASS
DetailsBrian Murphy
Signed off per ePlanReview
Permit Ready to Issue  6/30/2020  
Plan Mod MEt
Routing - Design Review6/11/2020 6/24/2020 PASS
DetailsJosh Wilson
Routing - FIRE6/11/20206/11/20206/19/2020 PASS
DetailsErika Akin
Plan mod does not impact previous approval or FD access.
Routing - PLANNING6/11/2020 6/18/2020 PASS
DetailsDavid Moser
Routing - PLAN CHECK6/10/2020 6/18/2020 PASS
DetailsJulie Romig
Routing PW Flood Plain6/15/2020 6/17/2020 CANC
DetailsJason C. Taylor
Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing PW Solid Waste6/15/2020 6/16/2020 PASS
DetailsEvan Carpenter
Routing PW Environmental6/15/2020 6/16/2020 PASS
DetailsZach Conde
PER ZACH: Passed on ePlan with no comments. Please pass on Tidemark
Routing - PUBLIC WORKS6/11/2020 6/15/2020 PASS
DetailsMorgan Webb
Routing PW Drainage6/15/2020 6/15/2020 FAIL
DetailsBrian Murphy
NEED SIGNED APENDIX J IN PDF
Routing PW Street Lights6/15/2020 6/15/2020 PASS
DetailsTom Marshall
Routing PW Sewer Design6/15/2020 6/15/2020 PASS
DetailsDeAnn Brown
Plan Modification Accepted  6/9/2020 DONE
Plan Mod: Erik Chudy; Shifting Building 14' to the south to avoid existing utilities
Issue PAID IN FULL permit  4/14/2020 DONE
Print Occupancy Form  4/14/2020 DONE
OVERRIDE  3/6/2020  
Plan assigned to (JAR)12/12/201912/17/20193/6/2020 DONE
DetailsJulie Romig
4th Rev - 1st Rev Comp - 502 Barber Station Urgent Care
Routing - PLAN CHECK3/2/2020 3/6/2020 PASS
DetailsJulie Romig
Per Julie's email on 3/6/2020
PLANS/APPL TAKEN TO FRONT DESK  3/6/2020 DONE
DetailsJulie Romig
Permit Ready to Issue  3/6/2020 DONE
met korey@bvadev.com
NEED
ACHD
GC
REVISED VALUE
Routing Off Site - STRUCTURAL3/2/2020 3/3/2020 PASS
DetailsJulie Romig
4th Review Stapley
Routing PW Sewer Design3/2/2020 3/3/2020 PASS
DetailsDeAnn Brown
Routing PW Drainage3/2/2020 3/2/2020 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL2/20/2020 2/28/2020 FAIL
DetailsJulie Romig
Stapley 3rd Rev
Routing PW Drainage2/20/2020 2/27/2020 FAIL
DetailsBrian Murphy
NEED APENDX J
Routing PW Sewer Design2/20/2020 2/27/2020 FAIL
DetailsDeAnn Brown
Still waiting on signed easements for sewer main extension that will serve this building. Resubmit after applicant has received a sewer plan approval letter.
Routing - Design Review2/20/2020 2/26/2020 PASS
DetailsJosh Wilson
Routing - PLAN CHECK2/20/2020 2/20/2020 FAIL
DetailsJulie Romig
Routing - PLAN CHECK2/3/2020 2/18/2020 FAIL
DetailsJulie Romig
Routing PW Sewer Design2/3/2020 2/10/2020 FAIL
DetailsDeAnn Brown
Still waiting on easement documents for sewer main extension that will serve this building. Resubmit after applicant has received a sewer plan approval letter.
Routing Off Site - STRUCTURAL2/3/2020 2/6/2020 FAIL
DetailsJulie Romig
Routing PW Drainage2/3/2020 2/5/2020 FAIL
DetailsBrian Murphy
need o/s trap o and m apnx j
Route to Impact Fee Review1/23/20201/26/20201/24/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE12/17/201912/17/20191/23/2020 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK12/17/2019 1/23/2020 FAIL
DetailsJulie Romig
1st review completed  1/23/2020 FAIL
DetailsJulie Romig
Routing - PLUMBING12/17/2019 12/27/2019 PASS
DetailsDan Ediger
Per Plans and ISPC
Routing PW Drainage12/18/2019 12/24/2019 FAIL
DetailsBrian Murphy
need site o and m for this site and apdx j.
Routing - Design Review12/17/2019 12/23/2019 PASS
DetailsJosh Wilson
Routing - MECHANICAL12/17/2019 12/20/2019 PASS
DetailsTroy James
Routing PW Street Lights12/18/2019 12/20/2019 PASS
DetailsTom Marshall
Routing - PLANNING12/17/2019 12/20/2019 PASS
DetailsDavid Moser
Routing PW Solid Waste12/18/2019 12/20/2019 PASS
DetailsEvan Carpenter
Routing PW Flood Plain12/18/2019 12/19/2019 PASS
DetailsJason C. Taylor
Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing PW Environmental12/18/2019 12/18/2019 PASS
DetailsRick Christenson
Routing - Addressing12/17/2019 12/18/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/17/2019 12/18/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment12/17/2019 12/18/2019 PASS
DetailsAndy J. Long
ESC plan approved. Certified RP listed. Need to provide dewatering plan for utilitty installation. Site preparation inspection is required.
Routing PW Sewer Design12/18/2019 12/18/2019 FAIL
DetailsDeAnn Brown
Sewer main extension required to serve this building has not yet been approved by City of Boise.
Plan Reviewer's activity  12/12/2019 PASS
Plan intake review approved
Intake Approval  12/12/2019 PASS
Intake Approval  12/10/2019 FAIL
(12-10-19) Refer to the circled items in the Plan Intake Checklist. Resolve each item as directed. CJW
Application received  12/9/2019 DONE
Application submitted via PDS Online on Dec 9 2019 8:54AM
Routing Off Site - STRUCTURAL12/17/2019 2/23/2019 FAIL
DetailsJulie Romig
Stapley