BLD-Energy code compliance | 3/31/2020 | 4/2/2020 | 4/2/2020 | A | PART |
Dave Hannah
|
|
|
clint Phone #: ###-#### ok to cover 1
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Dave Hannah
|
|
|
seal package // Clint Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | PART |
Dave Hannah
|
|
|
clint Phone #: ###-#### needs to add three headers over windows and install air seal package
|
BLD-Foundation | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PART |
Dave Hannah
|
|
|
Brandon- foundation wall Phone #: ###-####
|
BLD-Footing | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/6/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 12/9/2019 | 12/9/2019 | 12/31/2019 | | PASS |
Josh Bogle
|
|
|
12/13 remodel, paper - 1st done
|
Routing - PLAN CHECK | 12/31/2019 | | 12/31/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/31/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/31/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 12/31/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 12/31/2019 | | DONE |
|
|
|
called Clint and informed him of fees
|
Routing - PLAN CHECK | 12/16/2019 | | 12/16/2019 | | FAIL |
Josh Bogle
|
|
|
needs a structural roof plan
|
1st review completed | | | 12/16/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Josh Bogle
|
|
|
dropped off for level two review
|
Application received | | 12/9/2019 | | | |
|
|
|
|