BLD-Framing/Rough-in | 8/13/2020 | 8/13/2020 | 8/13/2020 | A | CANC |
Tell Riley
|
|
|
Bering Points Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
|
BLD-Framing/Rough-in | 8/5/2020 | 8/5/2020 | 8/5/2020 | A | PART |
Tell Riley
|
|
|
Truss Phone #: ###-#### Inspection requested via web by Shane Shade//see shane for truss bracing corrections and hager nailing//
|
Routing - MECHANICAL | 7/24/2020 | | 7/24/2020 | | PASS |
Troy James
|
|
|
Resubmitted acca report
|
BLD-Wall Bracing | 7/10/2020 | 7/10/2020 | 7/10/2020 | A | PART |
Tell Riley
|
|
|
Exterior Shear Phone #: ###-#### Inspection requested via web by Shane Shade//nailing ok//see plans for straps missing or need moved-circled in black pen//exterior nailing and straping only//
|
BLD-Concrete | 5/22/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Foundation | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok when rebar clearances are achieved//
|
BLD-Footing | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//setbacks set by surveyor//bar installed, ok when verts are under horz bar, add corner bar where discussed//
|
CHANGE STATUS TO (ISS) | | | 4/17/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/13/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 4/8/2020 | 4/8/2020 | 4/13/2020 | | DONE |
Rob Patrick
|
|
|
plan mod
|
Routing - PLAN CHECK | 4/13/2020 | | 4/13/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/13/2020 | | DONE |
|
|
|
Plan Mod Met
|
Plan Modification Accepted | | | 4/8/2020 | | DONE |
|
|
|
Pamela Gaines from NeuDesign requested a plan mod workflow started to upload truss information.
|
BLD-Conference | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | CANC |
Tell Riley
|
|
|
We need the initial grading inspection done for excavation to start. Phone #: ###-#### Inspection requested via web by Ed Kron
|
Issue PAID IN FULL permit | | | 2/6/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/3/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 12/30/2019 | 12/30/2019 | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
01/16 Townhouse L2 ePlan...01/10 Failed...01/29 Passed waiting for Planning and DR to review.
|
Routing - PLANNING | 2/3/2020 | | 2/3/2020 | | PASS |
Leon Letson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/3/2020 | | DONE |
|
|
|
ISSUE TOGETHER BLD19-04792 & 04797 - 04799
|
Routing - PLAN CHECK | 1/29/2020 | | 1/29/2020 | | PASS |
Rob Patrick
|
|
|
01/29 Passed...waiting for Plannings review
|
Routing - Design Review | 1/29/2020 | | 1/29/2020 | | PASS |
Katelyn Menuge
|
|
|
|
1st review completed | | | 1/10/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | | | 1/10/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLANNING | | | 1/9/2020 | | FAIL |
|
|
|
Comply with DR request for revisions
|
Routing - MECHANICAL | | | 1/3/2020 | | PASS |
|
|
|
|
Routing - Design Review | 1/3/2020 | | 1/3/2020 | | FAIL |
Katelyn Menuge
|
|
|
Design Review can't approve railing changes. Revert to previous design or provide a more contiguous look. Provide additional detail on the Milwaukee-facing elevation.
|
Route to Impact Fee Review | 12/31/2019 | 1/3/2020 | 1/2/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 12/31/2019 | | 1/2/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 1/2/2020 | | PASS |
Morgan Webb
|
|
|
CONTACT WEST BOISE SEWER DISTRICT
|
Telephone call | | | 12/30/2019 | | DONE |
|
|
|
Contacted Pam to inform her that not all the plan check fees have been paid. Once the other three have been paid we can route for review.
|
Intake Approval | | | 12/30/2019 | | PASS |
|
|
|
|
Intake Approval | | | 12/20/2019 | | FAIL |
|
|
|
2 of the manual J's did not upload properly. If you see a yellow triangle with an exclamation point in it, the docs have not uploaded. Please try again.
|
Intake Approval | | | 12/10/2019 | | FAIL |
|
|
|
The manual j's that were uploaded are for different units. I have deleted them. Please upload the four manual j for lots 19-22 with each one stating the address on them.
|
Application received | | | 12/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 9 2019 3:48PM
|
BLD-Framing/Rough-in | 8/13/2020 | 8/14/2020 | | A | |
Tell Riley
|
|
|
bearing points Phone #: ###-#### >> Inspection requested via web by Shane Shade
|