Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD19-04797
StatusIssued
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 3005 N NETWORK LN
Project NameUnit B lot 21
Customer Number19-04792 AND 04797-04799
ePlanReviewNo
Description
***04/13/20 PLAN MODIFICATION to update girder structural support at common wall *** (FOUR PERMITS FILED UNDER BLD19-04792) Permit for the construction of a new 2105 sq. ft., 3 story (first story 339 sq. ft., second story 972 sq. ft. and third story 794 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 438 sq. ft. of covered patio/porch and a 740 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. C-1D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/5/20208/5/20208/5/2020APART
DetailsTell Riley
Truss Phone #: ###-#### Inspection requested via web by Shane Shade//see shane for truss bracing corrections and hager nailing//
Routing - MECHANICAL7/24/2020 7/24/2020 PASS
DetailsTroy James
Resubmitted acca report
BLD-Wall Bracing7/10/20207/10/20207/10/2020APART
DetailsTell Riley
Exterior shear Phone #: ###-#### Inspection requested via web by Shane Shade//nailing ok//see plans for straps missing or need moved-circled in black pen//exterior nailing and straping only//
BLD-Concrete5/22/20205/22/20205/22/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade
BLD-Foundation5/7/20205/7/20205/7/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//ok when rebar clearances are achieved//
BLD-Footing5/1/20205/4/20205/4/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//setbacks set by surveyor//bar installed, ok when verts are under horz bar, add corner bar where discussed//
CHANGE STATUS TO (ISS)  5/1/2020 DONE
OVERRIDE  4/13/2020  
Plan assigned to (RDP)4/8/20204/8/20204/13/2020 DONE
DetailsRob Patrick
plan mod
Routing - PLAN CHECK4/13/2020 4/13/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  4/13/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  4/13/2020 DONE
Plan Mod Met
Plan Modification Accepted  4/8/2020 DONE
Pamela Gaines from NeuDesign requested a plan mod workflow started to upload truss information.
BLD-Conference2/18/20202/19/20202/19/2020ACANC
DetailsTell Riley
We need the initial grading inspection done for excavation to start. Phone #: ###-#### Inspection requested via web by Ed Kron
Issue PAID IN FULL permit  2/6/2020 DONE
Inspection Record Card- Bld  2/6/2020 DONE
Inspection Record Card- Bld  2/6/2020 DONE
Telephone call  2/4/2020 DONE
emailed applicant and GC to inform them that not all four townhomes fees have been paid and that we need all four permits to be paid for before we can issue the permits.
OVERRIDE  2/3/2020  
Plan assigned to (RDP)12/30/201912/30/20192/3/2020 DONE
DetailsRob Patrick
01/16 Townhouse L2 ePlan...01/10 Failed...01/29 Passed waiting for Planning and DR to review.
Routing - PLANNING2/3/2020 2/3/2020 PASS
DetailsLeon Letson
PLANS/APPL TAKEN TO FRONT DESK  2/3/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  2/3/2020 DONE
ISSUE TOGETHER BLD19-04792 & 04797 - 04799
Routing - Design Review1/29/2020 1/29/2020 PASS
DetailsKatelyn Menuge
1st review completed  1/10/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLAN CHECK  1/10/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLANNING  1/9/2020 FAIL
Comply with DR request for revisions.
Routing - Design Review1/9/2020 1/9/2020 FAIL
DetailsKatelyn Menuge
Design Review can't approve railing changes. Revert to previous design or provide a more contiguous look. Provide additional detail on the Milwaukee-facing elevation.
Routing - MECHANICAL  1/3/2020 PASS
Route to Impact Fee Review12/31/20191/3/20201/2/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - Addressing12/31/2019 1/2/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  1/2/2020 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT
Telephone call  12/30/2019 DONE
Contacted Pam to inform her that not all the plan check fees have been paid. Once the other three have been paid we can route for review.
Intake Approval  12/30/2019 PASS
Intake Approval  12/20/2019 FAIL
2 of the manual J's did not upload properly. If you see a yellow triangle with an exclamation point in it, the docs have not uploaded. Please try again.
Intake Approval  12/10/2019 FAIL
The manual j's that were uploaded are for different units. I have deleted them. Please upload the four manual j for lots 19-22 with each one stating the address on them.
BLD-Framing/Rough-in8/13/20208/14/2020 A 
DetailsTell Riley
bearing Phone #: ###-#### >> Inspection requested via web by Shane Shade
Application received 12/10/2019