BLD-Framing/Rough-in | 8/5/2020 | 8/5/2020 | 8/5/2020 | A | PART |
Tell Riley
|
|
|
truss Phone #: ###-#### Inspection requested via web by Shane Shade//see shane for truss bracing corrections and hager nailing//
|
Routing - MECHANICAL | 7/24/2020 | | 7/24/2020 | | PASS |
Troy James
|
|
|
Resumitted acca report
|
BLD-Wall Bracing | 7/10/2020 | 7/10/2020 | 7/10/2020 | A | PART |
Tell Riley
|
|
|
exterior shear Phone #: ###-#### Inspection requested via web by Shane Shade//nailing ok//see plans for straps missing or need moved-circled in black pen//exterior nailing and straping only//
|
BLD-Concrete | 5/22/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Foundation | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PART |
Tell Riley
|
|
|
Ready by 1pm Phone #: ###-#### Inspection requested via web by Shane Shade//ok when rebar clearances are achieved//
|
BLD-Footing | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//setbacks set by surveyor//bar installed, ok when verts are under horz bar, add corner bar where discussed//
|
CHANGE STATUS TO (ISS) | | | 5/1/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/13/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 4/8/2020 | 4/8/2020 | 4/13/2020 | | DONE |
Rob Patrick
|
|
|
plan mod
|
Routing - PLAN CHECK | 4/13/2020 | | 4/13/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/13/2020 | | DONE |
|
|
|
Plan Mod Met
|
Plan Modification Accepted | | | 4/8/2020 | | DONE |
|
|
|
Pamela Gaines from NeuDesign requested a plan mod workflow started to upload truss information.
|
BLD-Conference | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | CANC |
Tell Riley
|
|
|
We need the initial grading inspection done for excavation to start. Phone #: ###-#### Inspection requested via web by Ed Kron
|
Issue PAID IN FULL permit | | | 2/6/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/4/2020 | | |
|
|
|
|
Telephone call | | | 2/4/2020 | | DONE |
|
|
|
emailed applicant and GC to inform them that not all four townhomes fees have been paid and that we need all four permits to be paid for before we can issue the permits.
|
Routing - PLAN CHECK | 2/3/2020 | | 2/4/2020 | | PASS |
Rob Patrick
|
|
|
|
OVERRIDE | | | 2/3/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 12/30/2019 | 12/30/2019 | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
01/16 Townhouse L2 ePlan...01/10 Failed...01/29 Passed waiting for Planning and DR to review.
|
Routing - PLANNING | 2/3/2020 | | 2/3/2020 | | PASS |
Leon Letson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/3/2020 | | DONE |
|
|
|
ISSUE TOGETHER BLD19-04792 & 04797 - 04799
|
Routing - Design Review | 1/29/2020 | | 1/29/2020 | | PASS |
Katelyn Menuge
|
|
|
|
1st review completed | | | 1/10/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | | | 1/10/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLANNING | | | 1/9/2020 | | FAIL |
|
|
|
Comply with DR request for revisions.
|
Routing - MECHANICAL | | | 1/3/2020 | | PASS |
|
|
|
|
Routing - Design Review | 1/3/2020 | | 1/3/2020 | | FAIL |
Katelyn Menuge
|
|
|
Design Review can't approve railing changes. Revert to previous design or provide a more contiguous look. Provide additional detail on the Milwaukee-facing elevation.
|
Route to Impact Fee Review | 12/31/2019 | 1/3/2020 | 1/2/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 12/31/2019 | | 1/2/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 1/2/2020 | | PASS |
Morgan Webb
|
|
|
CONTACT WEST BOISE SEWER DISTRICT
|
Telephone call | | | 12/30/2019 | | DONE |
|
|
|
Contacted Pam to inform her that not all the plan check fees have been paid. Once the other three have been paid we can route for review.
|
Intake Approval | | | 12/30/2019 | | PASS |
|
|
|
|
Intake Approval | | | 12/20/2019 | | FAIL |
|
|
|
2 of the manual J's did not upload properly. If you see a yellow triangle with an exclamation point in it, the docs have not uploaded. Please try again.
|
Intake Approval | | | 12/10/2019 | | FAIL |
|
|
|
The manual j's that were uploaded are for different units. I have deleted them. Please upload the four manual j for lots 19-22 with each one stating the address on them.
|
BLD-Framing/Rough-in | 8/13/2020 | 8/14/2020 | | A | |
Tell Riley
|
|
|
bearing Phone #: ###-#### >> Inspection requested via web by Shane Shade
|
Application received | | 12/10/2019 | | | |
|
|
|
|