BLD-Final | 2/3/2020 | 2/5/2020 | 2/6/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Marko
|
DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 12/23/2019 | 12/26/2019 | 12/26/2019 | A | PART |
Dave Hannah
|
|
|
Please call the number provided before heading out to the site. Phone #: ###-#### Inspection requested via web by Kelly Marko ok to rerock damaged area
|
Plan assigned to (JG) | 12/23/2019 | 12/23/2019 | 12/23/2019 | | PASS |
Javier Guzman
|
|
|
12/24 L1 Myrtle Garage Drywall Repair eplan
|
Routing - PLAN CHECK | 12/23/2019 | | 12/23/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 12/23/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/23/2019 | | DONE |
|
|
|
met: Need GC
|
Telephone call | | | 12/23/2019 | | DONE |
|
|
|
emailed the GC with a form 302 to let them know we need this form before we can issue the permit.
|
Issue PAID IN FULL permit | | | 12/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/23/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/20/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 12/19/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Contact the records department (Records ###-####) again and request the sheets A8.1 and A8.4 to view pertinent information given in the details called out for the stairwell area, Provide and upload the plan sheets A8.1 and A8.4 to view details called out for the stairwell area.
|
Intake Approval | | | 12/18/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Provide a completed 518 checklist (Incomplete submittals will not be accepted)
• Checklist can be found at https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/?category=all&search=all
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Provide and upload the plan sheets A8.1 and A8.4 to view details called out for the stairwell area
|
Application received | | | 12/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 11 2019 10:14AM
|