Permit Information
Permit NumberBLD19-04862
StatusFinaled
Name HC COMPANY INC
Site Address 5777 N MEEKER AVE
Project NameWaFd Bank Phase 1 Demo only
Customer Number 
ePlanReviewYes
Description
(WAFD BANK - 1ST FLOOR - DEMO ONLY) This building is fire sprinkled Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. All building fire sprinkler and smoke alarm systems must be maintained throughout the demo and after demo is completed. Permit for demo only of approximately 14,280 sqft of office space on the 1st floor of a 2-story with basement approximately 98,400 sqft office building. See BLD19-04625 for building history. Demo work to include: Demo of non-bearing interior walls, doors, ceiling, millwork, finishes, mechanical work, electrical work, and plumbing work. New work: Construct temporary walls while maintaining exit access for the remainder of the building. Approval is contingent to adhering to the approved plans, notations, local codes and ordinances. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  4/21/2020 DONE
5-28-20 spoke with Christina on the values that were submitted for the traits, per CP we dont look at those values for this because it is a DEMO only JCA //5-4-2020 spoke with John from HC Comp. and he will find out the Electrical permit nuumber for this project and email the info so that we can can attached it JCA //4/29/20 Value did not change no fees, but cannot find a Electrical permit for this project, called John and left a message to give him an option to submit online or give us the ELE permit for this project. erase the values incase he goes on line to submit, will make a follow up call next week//working on final values
Second Notice 3/15/20204/3/2020 DONE
mailed 4-6-2020
First Notice3/2/20203/2/20203/5/2020 DONE
DetailsMike Jordan
mailed 3-6-20
BLD-Final3/2/20203/2/20203/2/2020PPASS
DetailsMike Jordan
John Phone #: ###-####
DOC - Permit Finaled3/2/20203/2/20203/2/2020PPASS
DetailsMike Jordan
Issue PAID IN FULL permit  1/14/2020 DONE
Inspection Record Card- Bld  1/14/2020 DONE
Routing - PLAN CHECK1/8/2020 1/8/2020 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  1/8/2020 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/8/2020 DONE
all met: jriordan@hcco-inc.com

NEED
GC
Revised Certificate of Value
Plan assigned to (M_H)12/18/2019 1/8/2020 DONE
DetailsMichael Hanson
1st review completed - 12/23 #518 L1 ePlan - WaFd Bank Phase 1 Demolition
Route to Impact Fee Review12/23/201912/26/201912/24/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
1st review completed  12/23/2019 FAIL
DetailsMichael Hanson
Routing - PLAN CHECK12/18/2019 12/23/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for correction required.
Routing - MECHANICAL12/18/2019 12/18/2019 PASS
DetailsTroy James
Intake Approval  12/17/2019 PASS
DetailsJavier Guzman
Application received  12/16/2019 DONE
Application submitted via PDS Online on Dec 16 2019 3:25PM