Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-04867
StatusIssued
Name JLJ ENTERPRISES INC
Site Address 3111 N 26TH ST
Project Name26th Street
Customer Number 
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 1643 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 239 sq. ft. of covered patio/porch and a 566 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN ***Sprinklers are not required***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation8/3/20208/4/20208/4/2020APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Edgar Sanchez// work in progress
BLD-Foundation7/30/20207/31/20207/31/2020ANR
DetailsTony Young
Edgar */Screened*/ Phone #: ###-####
BLD-Footing7/29/20207/30/20207/30/2020APASS
DetailsTony Young
Edgar */Screened*/ Phone #: ###-####
PubWorks Subgrade Approval7/30/20207/30/20207/30/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Place hold on job6/26/2020 6/29/2020 DONE
DetailsTiffany Carson-Herker
waiting for signed permit
Telephone call  6/26/2020 DONE
Emailed a reminder to the GC to please sign the permits and email them back to me, so we can release the approved plans.
Issue PAID IN FULL permit  6/24/2020 DONE
Inspection Record Card- Bld  6/24/2020 DONE
Telephone call  6/22/2020 DONE
sent email about expired permit
OVERRIDE  6/15/2020  
Plan assigned to (J_N)12/31/201912/31/20196/15/2020 DONE
DetailsJenny Nelson
2nd complete 01/16 sfd L1 ePlan
Routing PW Grading-Hillside6/11/2020 6/15/2020 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
PLANS/APPL TAKEN TO FRONT DESK  6/15/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  6/15/2020 DONE
met
NEED
RP
Routing - PLAN CHECK6/11/2020 6/11/2020 PASS
DetailsJenny Nelson
Routing - PLAN CHECK6/9/2020 6/9/2020 FAIL
DetailsJenny Nelson
Need fire marshal approval for EIFS eave system, need shear calcs updated to current year
Plan Reviewer's activity  6/5/2020  
Contacted fire marshall about using EIFS system over 5/8"typ x gyp and hardie soffit - waiting to hear back.
Routing PW Grading-Hillside6/2/2020 6/2/2020 FAIL
DetailsJason C. Taylor
See change marks. Jason Taylor ###-####
Routing PW Grading-Hillside12/31/2019 1/9/2020 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan
Routing - PLAN CHECK12/31/2019 1/8/2020 FAIL
DetailsJenny Nelson
Need calcs for foundation, need full foundation plan, 2016 engineering needs to be updated for current code cycle, soffit vent non compliant with WUI, need 310 form for pier foundation
1st review completed  1/8/2020 DONE
DetailsJoe Bruce
Routing - PLANNING12/31/2019 1/7/2020 PASS
DetailsLeon Letson
Passed in eplan - updating tidemark
Routing - MECHANICAL12/31/2019 1/3/2020 PASS
DetailsChad Schwendiman
Route to Impact Fee Review12/31/20191/3/20201/2/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - FIRE12/31/201912/31/201912/31/2019 PASS
DetailsLee G Meredith
Sprinklers are not required.
Intake Approval  12/31/2019 PASS
Routing - Addressing12/31/2019 12/31/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/31/2019 12/31/2019 PASS
DetailsCandy A. Nichols
Routing - Erosion and Sediment12/31/2019 12/31/2019 PASS
DetailsMichael Zawacki
Site prep required.
Intake Approval  12/30/2019 FAIL
2nd prescreen- Doc B160425g geotech needs to be updated, the engineer stamp has the 2016 date. Please upload a new document with same name so that it can version over.
Meeting  12/30/2019 DONE
per Jenny it is okay to accept the prescreen with the 2016 date on the Geotech doc, aplicant will resubmit
Intake Approval  12/18/2019 FAIL
Per Plan Reviewer Calculations and Foundation Plans needs to be updated for the Engineers Stamp. Calcs have 2016 and Foundation has 2018.
Application received  12/17/2019 DONE