Permit Information
Permit NumberBLD19-04890
StatusFinaled
Name COVERTECH
Site Address 5525 E HOOTOWL DR
Project NameSean & Michelle Delacy Pergola
Customer Number 
ePlanReviewYes
Description
Permit for 240sq' (12’x20’) of pre-engineered metal shade cover. Footings to be 23”x23”x24” – cover will wall-mount. All work per plans, engineering, manufacturer’s specs, & local code. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/27/20201/28/20201/28/2020APASS
DetailsDave Hannah
Final can be done at anytime. Permit folder is onsite. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
DOC - Permit Finaled1/28/20201/28/20201/28/2020PPASS
DetailsDave Hannah
BLD-Footing1/22/20201/23/20201/23/2020AFAIL
DetailsBrandon Shaw
Need soil subgrade submitted and approved by PW...
No city approved plans or permit on site...
PubWorks Subgrade Approval1/23/20201/23/20201/23/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  1/2/2020 DONE
Inspection Record Card- Bld  1/2/2020 DONE
OVERRIDE  12/30/2019  
Plan assigned to (JAB) Josh12/18/201912/18/201912/30/2019 PASS
DetailsJosh Bogle
12/24 patio cover, ePlan
Routing - PLAN CHECK12/18/2019 12/30/2019 PASS
DetailsJosh Bogle
1st review completed  12/30/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  12/30/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  12/30/2019 DONE
met
Routing PW Grading-Hillside12/18/2019 12/26/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Routing - FIRE12/18/201912/18/201912/19/2019 PASS
DetailsLee G Meredith
Sprinklers are not required.
Application received  12/18/2019 DONE
Application submitted via PDS Online on Dec 18 2019 9:07AM
Intake Approval  12/18/2019 PASS
Routing - PLANNING12/18/2019 12/18/2019 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS12/18/2019 12/18/2019 PASS
DetailsCandy A. Nichols
NO NEW PLUMBING
Routing - Erosion and Sediment12/18/2019 12/18/2019 PASS
DetailsMichael Zawacki
waiver approved