Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-04891
StatusFinaled
Name MCCARTER-MOORHOUSE LLC
Site Address 7800 W USTICK RD Unit: 100
Project NameDr. Paige Schmidt TI
Customer Number 
ePlanReviewYes
Description
(BAY POINTE DENTAL CENTER BLDG. #1 - DR. PAIGE SCHMIDT T.I.) 04-06-2020 PLAN MODIFICATION CLARIFICATION MADE TO THE CONSTRUCTION OF THE MED GAS ROOM. This building is fire sprinkled. Permit to remodel an existing 2,800 sqft. office space for use as a dental office. Work to include: demo non-bearing interior walls, construct non-bearing interior walls, new lighting, new finishes, mechanical work, electrical work, and plumbing work. 1 hour fire rated walls required at med gas closet. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20207/20/2020 DONE
This permit finaled on the web by Drew Moorhouse
First Notice 5/22/20207/9/2020 DONE
mailed 7-9-2020
Permanent Occupancy  5/12/2020 DONE
BLD-Final5/11/20205/11/20205/11/2020PPASS
DetailsTell Riley
I would like to meet you onsite to review.

Dana McCarter
###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse//final ok see notes below//add second microwave that is in an accessible location or lower the one onsite//letter from architect needs to be submitted and added to documents for project//
FIRE-Final Inspection5/8/20205/11/20205/11/2020APASS
DetailsTroy Cobbley
Life safety passed.

I would like to meet you onsite.

Thanks,
Dana Phone #: ###-#### Inspection requested via web by Drew Moorhouse
FIRE-Final Inspection5/7/20205/8/20205/8/2020AFAIL
DetailsTroy Cobbley
Life safety will be ok to sign off when the project related fire alarm permit is finaled.

I would like to meet onsite to review any corrections if need be.

Thanks,
Dana McCarter
###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
BLD-Conference4/29/20204/30/20204/30/2020PDONE
DetailsTell Riley
meet Drew ###-####//discuss med gas room, need architect to approve as built design, 2x6 wall does not extend to underside of roof deck, although shaft is lined with 2 layers 5/8 typ X, walls below are 2x6 with 5/8 type x on both sides//does not match plans//
BLD-Ceiling Grid Inspection4/28/20204/29/20204/29/2020PPASS
DetailsTell Riley
I would like to meet you onsite to review any correction if need be.

Thanks,
Drew Moorhouse
McCarter-Moorhouse
###-####


Phone #: ###-#### Inspection requested via web by Drew Moorhouse// fix insulation above exam area//add clips to wall connections in back room, other wise ok to cover grid//will meet Drew thursday regarding med gas room and fire wall//
Change Expiration Date Only  4/9/2020 DONE
Permit issued by mistake 4/9/20, updating expiration date to match last inspection
Print Occupancy Form  4/9/2020 DONE
Permit Ready to Issue  4/7/2020 DONE
DO NOT ISSUE- plan mod approved
Plan assigned to (M_H)3/25/2020 4/6/2020 DONE
DetailsMichael Hanson
04/01 plan mod - Clarification made to the construction of the med gas room
Routing - PLAN CHECK3/31/2020 4/6/2020 PASS
DetailsMichael Hanson
Plan mod review fee = 1 hour
PLANS/APPL TAKEN TO FRONT DESK  4/6/2020 DONE
DetailsMichael Hanson
Plan Modification Accepted  3/25/2020 DONE
plan mod 1
BLD-Framing/Rough-in3/16/20203/16/20203/16/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Drew Moorhouse//wall cover only//do not cover med gas room, or area needing sprinklers moved//
BLD-Conference3/13/20203/16/20203/16/2020ADONE
DetailsTell Riley
We would like to meet onsite at 10AM Phone #: ###-#### Inspection requested via web by Drew Moorhouse
BLD-Conference3/13/20203/13/20203/13/2020PDONE
DetailsTell Riley
requested by Mech inspector to look at med gas room//CN posted for contractor to contact me for conference regarding med gas room ratings and construction//
BLD-Framing/Rough-in3/2/20203/3/20203/3/2020ANR
DetailsBrandon Shaw
Need grades...
Meeting  3/3/2020 DONE
*Address was wrong when applicant applied for permit and it was not caught untill the plumbing inspector went out for inspection so the permit was issued to the wrong address, Doug in addressing clarify it with the architect see email in documents, permit was re-printed and email to contractor to sign.
(F) Reprint permit  3/3/2020 DONE
Print Occupancy Form  3/3/2020 DONE
Issue PAID IN FULL permit  2/19/2020 DONE
Print Occupancy Form  2/19/2020 DONE
CHANGE ISSUED DATE  2/19/2020 DONE
Permit issued by mistake 4/9/20, updating issue date to original
Telephone call  2/11/2020 DONE
emailed fees to contractor
Plan assigned to (M_H)12/30/2019 2/7/2020 DONE
DetailsMichael Hanson
3rd review completed - 01/09 #518 L2 ePlan - Dr. Paige Schmidt
Routing - PLAN CHECK2/7/2020 2/7/2020 PASS
DetailsMichael Hanson
2 hour plan review fee
Permit Ready to Issue  2/7/2020 DONE
MET DREW@MCCARTER-MOORHOUSE.COM
NEED
GC FORM
REVISED VALUE
Routing - FIRE2/5/20202/5/20202/5/2020 PASS
DetailsGreg Ruxton
Attached revised comments to case. Issues resolved.
Routing - PLAN CHECK2/5/2020 2/5/2020 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing - PLAN CHECK2/4/2020 2/4/2020 FAIL
DetailsMichael Hanson
See changemarks in ePLan for corrections required.
Routing - PLAN CHECK1/24/2020 1/24/2020 FAIL
DetailsMichael Hanson
Route to Impact Fee Review1/14/20201/17/20201/15/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
1st review completed  1/14/2020 FAIL
DetailsMichael Hanson
Routing - FIRE12/30/201912/30/20191/13/2020 FAIL
DetailsGreg Ruxton
Attached comments to case and emailed architect.
Routing - PLAN CHECK12/30/2019 1/8/2020 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing PW Environmental1/2/2020 1/6/2020 PASS
DetailsRick Christenson
Passed with required amalgam separator as shown.
Routing - PUBLIC WORKS12/30/2019 1/2/2020 PASS
DetailsMorgan Webb
WEST BOISE SEWER DISTRICT
Routing - MECHANICAL12/30/2019 12/30/2019 PASS
DetailsTroy James
Routing - PLUMBING12/30/2019 12/30/2019 PASS
DetailsDaryl Spivey
Per plan , ISPC and NFPA99
Routing - Addressing12/30/2019 12/30/2019 PASS
DetailsDoug Chausow
Corrected address: 7800 W Ustick Rd, Ste 100
Intake Approval  12/27/2019 PASS
DetailsJavier Guzman
Intake Approval  12/23/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A2.1, A0.1 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Provide a suspended acoustic ceiling detail section on plans
• Per checklist provide Fire Resistive Assembly Penetrations details for the rated medical gas wall penetration
• Per checklist provide and show Portable Fire Extinguisher locations
Application received  12/18/2019 DONE
Application submitted via PDS Online on Dec 18 2019 1:16PM