BLD-Energy code compliance | 5/27/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Admin Assistant
|
BLD-Framing/Rough-in | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Admin Assistant
|
BLD-Wall Bracing | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Bruno
|
BLD-Foundation | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears//setbacks measured with contractor,, appear to meet minimums//
|
PubWorks Subgrade Approval | 3/19/2020 | 3/19/2020 | 3/19/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | NR |
Tell Riley
|
|
|
Request an early afternoon inspection. 1:30 would be great! Phone #: ###-#### Inspection requested via web by Ben Sears//need subgrade approval for rest of house prior to footings//
|
BLD-Foundation | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 2/28/2020 | 2/28/2020 | 2/28/2020 | A | PART |
Brandon Shaw
|
|
|
Work in progress... Basement walls...
|
PubWorks Subgrade Approval | 2/25/2020 | 2/25/2020 | 2/25/2020 | | DONE |
Melissa Jannusch
|
|
|
*BASEMENT
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/7/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 1/31/2020 | 1/31/2020 | 2/7/2020 | | DONE |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/7/2020 | | DONE |
|
|
|
MET
(ACH19-00860 should not have been voided, please issue it after the fees are paid)
|
Routing PW Grading-Hillside | 2/5/2020 | | 2/5/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLANNING | 1/31/2020 | | 1/31/2020 | | PASS |
Jeff Lowe
|
|
|
|
Routing - PLAN CHECK | 1/31/2020 | | 1/31/2020 | | PASS |
Rob Patrick
|
|
|
|
Routing PW Grading-Hillside | 1/3/2020 | | 1/16/2020 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
1st review completed | | | 1/16/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 1/2/2020 | | 1/7/2020 | | FAIL |
Jeff Lowe
|
|
|
Patios that are one foot or taller in height may not occupy the setback. The measurements on the grading plan show the patio to be 3.35 feet above grade at the southwest corner of the proposed patio. Thus, the patio as proposed would not be allowed as it extends into the street side setback.
|
Routing - PLAN CHECK | 1/2/2020 | | 1/7/2020 | | FAIL |
Debbie Sanine
|
|
|
Corrections & Clarifications Required
|
Routing - MECHANICAL | 1/2/2020 | | 1/6/2020 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 1/2/2020 | 1/5/2020 | 1/3/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 1/2/2020 | 1/2/2020 | 1/3/2020 | | PASS |
Lee G Meredith
|
|
|
New SFH
Sprinklers are not required.
|
Routing - Addressing | 1/2/2020 | | 1/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/2/2020 | | 1/3/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 1/2/2020 | | 1/3/2020 | | PASS |
Michael Zawacki
|
|
|
Site prep required.
|
VOIDED CHANGE STATUS | | | 1/2/2020 | | DONE |
|
|
|
MET: SEE BLD20-00014 (should of been a 404 application)
|
Intake Approval | | | 1/2/2020 | | PASS |
|
|
|
|
CHANGE STATUS TO (PND) | | | 1/2/2020 | | DONE |
|
|
|
changed back to issued status. Applicant submitted a 404 application and it was uploaded.
|
Telephone call | | | 12/31/2019 | | DONE |
|
|
|
ALL MET:
emailed applicant to let them know that I erroneously passed this permit on ePlan and will require further documentation and some editing of a drawing upload. Need 404 application, need the fire flow letter, and the Erosion and Sediment Control Narrative document. Also, the GRD and ESC drawings must be uploaded as individual files. I asked them to email me the letters and drawings requested and I will upload them.
|
CHANGE STATUS TO (PND) | | | 12/31/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/19/2019 | | FAIL |
|
|
|
met: Need Manual J
|
Application received | | | 12/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 18 2019 4:37PM
|