BLD-Final | 1/17/2020 | 1/21/2020 | 1/22/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | DEFR |
Brandon Shaw
|
|
|
No structural alteration is required per stamped and signed engineer’s evaluation letter.
|
Issue PAID IN FULL permit | | | 12/31/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/31/2019 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 12/30/2019 | 12/30/2019 | 12/30/2019 | | DONE |
Rob Patrick
|
|
|
12/26 PV, ePlan
|
Plan assigned to (JAB) Josh | 12/20/2019 | 12/20/2019 | 12/30/2019 | | DEFR |
Josh Bogle
|
|
|
12/26 PV, ePlan
|
Routing - PLAN CHECK | 12/30/2019 | | 12/30/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 12/30/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 12/30/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 12/20/2019 | | 12/23/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/20/2019 | | PASS |
|
|
|
|
Application received | | | 12/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 19 2019 3:25PM
|