Second Notice | | 5/17/2020 | 5/14/2020 | | DONE |
|
|
|
This permit finaled on the web by David Hurley
|
First Notice | | 4/4/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PASS |
Mike Jordan
|
|
|
This if for Final BLD Structural Inspection, the following inspections have previously been finaled for permanent occupancy (Electrical, FLS, FS, Mechanical, Plumbing) Structural is the only remaining for permanent occupancy. Phone #: ###-#### Inspection requested via web by David Hurley. Ok for perm occ.
|
Permanent Occupancy | | | 3/25/2020 | | DONE |
|
|
|
|
BLD-Final | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PART |
Mike Jordan
|
|
|
Julian Phone #: ###-####. Ok to occupy cafeteria. Noted non functioning exit signs have been repaired. Fire extinguisher installed.
|
FIRE-Final Inspection | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Julian Phone #: ###-####
|
BLD-Final | 3/16/2020 | 3/18/2020 | 3/17/2020 | A | CANC |
Dave Hannah
|
|
|
Julian Phone #: ###-####
|
BLD-Framing/Rough-in | 3/4/2020 | 3/6/2020 | 3/6/2020 | A | PASS |
Mike Jordan
|
|
|
Julian Phone #: ###-####. Interior steel stud framed walls for closet.
|
BLD-Framing/Rough-in | 2/21/2020 | 2/24/2020 | 2/24/2020 | A | PART |
Mike Jordan
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by Julian Lopez. Interior steel stud framed walls for new storage and cafeteria areas. Pending electrical rough in inspection.
|
Issue PAID IN FULL permit | | | 2/21/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/21/2020 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 2/4/2020 | 2/4/2020 | 2/20/2020 | | DONE |
Brian McGowan
|
|
|
02/12 #518 L2 ePlan
|
Routing - PLAN CHECK | 2/20/2020 | | 2/20/2020 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 2/20/2020 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/20/2020 | | DONE |
|
|
|
MET walk in
Need
Revised Value
|
Plan Reviewer's activity | | | 2/18/2020 | | DONE |
Brian McGowan
|
|
|
As requested, I uploaded new drawings for Bret on 2/18 rather than send a Task back to him.
|
Routing PW Environmental | 2/4/2020 | | 2/5/2020 | | PASS |
Rick Christenson
|
|
|
|
Intake Approval | | | 2/4/2020 | | PASS |
Michael Hanson
|
|
|
Approved by BJM
|
Routing - PUBLIC WORKS | 2/4/2020 | | 2/4/2020 | | PASS |
Candy A. Nichols
|
|
|
NO NEW FEES CREDIT FOR DEMO
|
Intake Approval | | | 1/17/2020 | | FAIL |
Brian McGowan
|
|
|
Please address or provide the following for your Prescreen to be approved:
1. No Door schedule was on Sheet A601.
2. No details are provided for the W.H. installation.
|
Application received | | | 12/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2019 11:34AM
|