Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-04918
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 980 S BROADWAY AVE
Project NameCafe Rio
Customer Number 
ePlanReviewYes
Description
(CAFE RIO) Permit is to remodel an existing 3,000 sq. ft. restaurant tenant space for a new restaurant tenant. Work to include: interior demo; construction of new non-bearing interior walls; two multi-user toilet rooms accessible to the disabled; new UL listed kitchen equipment; mechanical work including a new Type I Hood and new rooftop unit; plumbing including saw cutting existing concrete slab; electrical; and interior finishes in compliance with Ch. 8 of the 2015 IBC. All work shall comply with the approved drawings, the plan review report, and all applicable codes. This building is NOT fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20208/11/2020 DONE
MAILED 8-14-2020
First Notice6/24/20206/24/20207/9/2020 DONE
DetailsBrandon Shaw
mailed 7-9-2020
Permanent Occupancy  7/2/2020 DONE
BLD-Final6/24/20206/24/20206/24/2020PPASS
DetailsBrandon Shaw
screened // David Phone #: ###-####
DOC - Permit Finaled6/24/20206/24/20206/24/2020PPASS
DetailsBrandon Shaw
Zoning Approval6/19/20206/19/20206/19/2020 PASS
DetailsJosh Wilson
FIRE-Final Inspection6/18/20206/18/20206/18/2020PPASS
DetailsTroy Cobbley
Life safety passed. Card signed. No sprinklers or alarms.

dave *screened* Phone #: ###-####
BLD-Ceiling Grid Inspection6/11/20206/11/20206/11/2020PPASS
DetailsBrandon Shaw
Screened- Dave Phone #: ###-####
BLD-Framing/Rough-in5/5/20205/6/20205/6/2020APART
DetailsBrandon Shaw
Pending trades, ok tocover one side only...
Print Occupancy Form  3/13/2020 DONE
Issue PAID IN FULL permit  3/13/2020 DONE
Plan assigned to (JAR)1/2/20201/2/20203/6/2020 DONE
DetailsJulie Romig
02/27 (5 days) - 2nd Rev - 1st Rev Comp - L3 Cafe Rio
Routing - PLAN CHECK2/21/2020 3/6/2020 PASS
DetailsJulie Romig
Passed per JAR email on 3/6/2020
PLANS/APPL TAKEN TO FRONT DESK  3/6/2020 DONE
DetailsJulie Romig
Permit Ready to Issue  3/6/2020 DONE
all met: topp@radixconstruction.com

NEED
GC
REV VALUES
Routing PW Flood Plain2/24/2020 3/2/2020 PASS
DetailsJason C. Taylor
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing PW Environmental2/24/2020 2/25/2020 PASS
DetailsZach Conde
Approved with grease abatement as shown.
Routing - MECHANICAL2/21/2020 2/24/2020 PASS
DetailsTroy James
Routing - PUBLIC WORKS2/21/2020 2/24/2020 PASS
DetailsMorgan Webb
Routing - PLUMBING2/21/2020 2/21/2020 PASS
DetailsDan Ediger
Per Plans and ISPC
Routing - Design Review2/21/2020 2/21/2020 PASS
DetailsJosh Wilson
Route to Impact Fee Review2/12/20202/15/20202/13/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  2/12/2020 FAIL
DetailsJulie Romig
Routing - PLAN CHECK1/2/2020 2/12/2020 FAIL
DetailsJulie Romig
Routing Off Site - C.D.H1/2/2020 2/10/2020 PASS
DetailsJulie Romig
Passed per ePlanReview
Routing - FIRE1/2/20201/2/20201/27/2020 PASS
DetailsErika Akin
Attached comments to case
Routing - PLANNING1/2/2020 1/9/2020 PASS
DetailsDavid Moser
Routing - MECHANICAL1/2/2020 1/7/2020 PASS
DetailsTroy James
Routing PW Environmental1/3/2020 1/6/2020 PASS
DetailsJulie Romig
Passed per ePlanReview
Routing - PUBLIC WORKS1/2/2020 1/3/2020 PASS
DetailsMorgan Webb
CUSTOMER SERVICE AREA THE SAME SIZE
Routing - PLUMBING1/2/2020 1/2/2020 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing1/2/2020 1/2/2020 PASS
DetailsDoug Chausow
Routing - Design Review1/2/2020 1/2/2020 FAIL
DetailsJosh Wilson
New paint colors and new door require Design Review approval. Applicant contacted.
Intake Approval  12/31/2019 PASS
Intake Approval  12/24/2019 FAIL
(12-24-19) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
Application received  12/20/2019 DONE
Application submitted via PDS Online on Dec 20 2019 4:30PM
Third Notice 8/16/2020