Permit NumberBLD19-04922
StatusIssued
Name CSDI CONSTRUCTION INC
Site Address 1019 W MAIN ST
Project Name11th & Main Apartments
Customer NumberBLD19-04943 (EARLY BLD20-00313)
ePlanReviewYes
Description
(11th & MAIN APARTMENTS) **PROJECT MANAGEMENT-Angie Brosious**TWO PERMITS** ""PLAN MODIFICATION #1 FOR CHANGES TO THE EXTERIOR AND MODIFICATIONS TO RATED WALLS AND CEILING"" The rated wall between the buildings have been modified to comply as 3 hour fire walls to acomodate the placement of a property line at this location. All openings between the buildings have been eliminated. Change of use for upper two floors of existing hotel rooms to apartments and portion of ground floor retail into a lobby to serve the new units and the new exit enclosure. Work will consist of the construction of a new 3 story one-hour rated exit enclosure and a new entry lobby, installation of new smoke/fire doors on the elevator at each story, new PTAC units, exterior windows and finishes, new corridor and stairway doors, interior room finishes, laundry facilities and common areas, and the creation of a type A dwelling unit. This building is being fully fire sprinklered and alarmed.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/6/20208/7/20208/8/2020APART
DetailsDave Hannah
Phone #: 2089854911 >> Inspection requested via mobile web by Steve Shuyler front entryway subfloor framing ok
BLD-Framing/Rough-in7/30/20207/31/20207/31/2020AFAIL
DetailsDave Hannah
As early as possible Phone #: 2089854911 >> Inspection requested via mobile web by Steve Shuyler stairs not to code trades are only 10 inchs
CHANGE STATUS TO (ISS)  6/2/2020 DONE
Plan assigned to (CDM)5/1/20205/1/20206/1/2020 PASS
DetailsCarl D Madsen
Plan Modification
Routing - PLAN CHECK5/1/2020 6/1/2020 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/1/2020 DONE
Permit Ready to Issue  6/1/2020 DONE
PLAN MOD
Routing - Design Review5/13/2020 5/14/2020 PASS
DetailsKayCee Babb
To comply with DRH20-00024 and DRH19-00480.
Plan Modification Accepted  5/1/2020 DONE
Per Angie (PM) Starting Plan Mod
Issue PAID IN FULL permit  4/1/2020 DONE
Plan assigned to (CDM)12/24/201912/24/20193/26/2020 PASS
DetailsCarl D Madsen
11th & Main Apartments L-3
Routing - PLAN CHECK3/26/2020 3/26/2020 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  3/26/2020 DONE
Permit Ready to Issue  3/26/2020 DONE
ALL MET

NEED
ACHD (per angie gc is paying with achd)

MET sent from angie b with pds
NEED:
GC
REV VALUES
Telephone call  3/26/2020 DONE
BEFORE ISSUING PLEASE ADD 1HR BLD CLERICAL FEE
Routing - PLAN CHECK3/4/2020 3/25/2020 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL3/4/2020 3/25/2020 PASS
DetailsCarl D Madsen
KPFF 2nd
Routing - Design Review3/9/2020 3/9/2020 PASS
DetailsKayCee Babb
To comply with DRH20-00024 and DRH19-00480.
Route to Impact Fee Review2/5/20202/8/20202/6/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE12/24/201912/24/20192/5/2020 PASS
DetailsErika Akin
Attached comments to case
1st review completed  2/5/2020 DONE
Routing - PLAN CHECK12/24/2019 1/22/2020 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL12/24/2019 1/9/2020 FAIL
DetailsCarl D Madsen
KPFF
Routing - MECHANICAL1/8/2020 1/8/2020 PASS
DetailsTroy James
Routing - PUBLIC WORKS12/24/2019 1/2/2020 PASS
DetailsMorgan Webb
CREDIT GIVEN FOR HOTEL ROOMS.
Routing - MECHANICAL12/24/2019 12/30/2019 FAIL
DetailsTroy James
Emailed corrections to Applicant.
Routing - PLUMBING12/24/2019 12/30/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Erosion and Sediment12/24/2019 12/27/2019 PASS
DetailsAndy J. Long
No new exterior disturbance listed in scope, no ESC permit required.
Routing - Addressing12/24/2019 12/27/2019 PASS
DetailsDoug Chausow
Apts 201-235, 301-343 (odd numbers only)
Routing - PLANNING12/24/2019 12/26/2019 PASS
DetailsEthan Mansfield
Routing - Design Review12/24/2019 12/26/2019 FAIL
DetailsKayCee Babb
Elevations do not match those approved through DRH19-00480, due to window alterations; a Design Review modification is required prior to resubmittal of Building permit. Exterior lighting details - such as location, fixtures, etc. - need to be provided to Design Review Staff. If projecting slats do not extend beyond the property line, site plan shall call out building wall and slats separately for verification.
Intake Approval  12/24/2019 FAIL
DetailsCarl Westfall
(12-24-19) See the circled item in the Plan Intake Checklist. Please provided the requested application (not plan intake checklist). CJW
Plan Reviewer's activity  12/24/2019 PASS
DetailsCarl Westfall
Plan intake review approved
Intake Approval  12/24/2019 PASS
Application received  12/20/2019 DONE
Application submitted via PDS Online on Dec 20 2019 5:41PM
BLD-Framing/Rough-in8/13/20208/14/2020 A 
DetailsDave Hannah
As early as possible Phone #: 2089854911 >> Inspection requested via mobile web by Steve Shuyler