Permit NumberBLD19-04940
StatusIssued
Name FIRST CALL LLC
Site Address 1387 S VINNELL WAY Unit: STE 215
Project NameGSA BLM - Suite 215 & 216
Customer Number 
ePlanReviewYes
Description
GSA BUREAU OF LAND MANAGEMENT – SUITES 215 & 216) //6-12-2020 PLAN MODIFICATION TO CHANGE THE HEIGHT OF THE NEW PARTITION WALLS TO BE 6' ABOVE THE ACT, INSTEAD OF FULL HEIGHT TO DECK ABOVE. jg// Permit is to remodel an existing 11,900 sq. ft. office tenant space within the second floor of the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select suspended acoustic ceiling, construction of select new interior non-bearing walls to create three offices, select new door/door frames, select new interior windows, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered for hour substitution. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/20/20207/21/20207/21/2020AFAIL
DetailsTroy Cobbley
Needs fire alarm notification modifications around two of the three added offices. Tim - */Screened*/ Phone #: ###-####
BLD-Framing/Rough-in6/17/20206/17/20206/17/2020PPASS
DetailsMike Jordan
call ahead - screened // TIm Phone #: ###-####. Interior steel stud framed walls for new offices.
CHANGE STATUS TO (ISS)  6/16/2020 DONE
plan mod
Permit Ready to Issue  6/15/2020 DONE
PLAN MOD accepted- do not issue
Plan assigned to (JG)6/3/20206/3/20206/12/2020 PASS
DetailsJavier Guzman
06/12 plan mod GSA BLM - Suite 215 & 216 ePlan
Routing - PLAN CHECK6/8/2020 6/12/2020 PASS
DetailsJavier Guzman
Route to Impact Fee Review6/3/20206/6/20206/4/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan Modification Accepted  6/3/2020 DONE
We are changing the height of the new partition walls to be 6' above the act, which is the building standard, instead of full height to deck. Changes were made to the wall attachement details and the wall types on sheet a2.11
Print Occupancy Form  5/20/2020 DONE
Issue PAID IN FULL permit  5/19/2020 DONE
Plan assigned to (JG)12/30/201912/30/20191/7/2020 PASS
DetailsJavier Guzman
12/31 L1 GSA - BLM office ePlan, pend PW
PLANS/APPL TAKEN TO FRONT DESK  1/7/2020 DONE
Permit Ready to Issue  1/7/2020 DONE
MET Charlene Meadows
GC Form
Revised Cert of Value
Routing - PUBLIC WORKS12/30/2019 1/2/2020 PASS
DetailsMorgan Webb
NO NEW PLUMBING
1st review completed  1/2/2020 DONE
DetailsJavier Guzman
Routing - PLAN CHECK12/30/2019 12/30/2019 PASS
DetailsJavier Guzman
Routing - Addressing12/30/2019 12/30/2019 PASS
DetailsDoug Chausow
Suite 215/216
Intake Approval  12/26/2019 PASS
DetailsJavier Guzman
Application received  12/24/2019 DONE
Application submitted via PDS Online on Dec 24 2019 10:09AM