BLD-Concrete | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | PART |
Mike Jordan
|
|
|
Gene *screened* Phone #: ###-####. 7 Panels ok pending special inspection.
|
BLD-Footing | 5/5/2020 | 5/5/2020 | 5/6/2020 | P | PART |
Mike Jordan
|
|
|
Gene Phone #: ###-####
|
BLD-Foundation | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | PART |
Mike Jordan
|
|
|
Gene Pour time at 12 Phone #: ###-####. East and west step footings and north footing line. Work in progress. ok to place concrete pending special inspection.
|
BLD-Footing | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | DEFR |
Mike Jordan
|
|
|
Sreened-Rebar-Jean Phone #: 208-###-####. Interior column pad footings, ok pending special inspection.
|
BLD-Footing | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Mike Jordan
|
|
|
Jean ***cleared*** Phone #: ###-####. south exterior footing ok.
|
Issue PAID IN FULL permit | | | 3/20/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/19/2020 | | |
|
|
|
|
Plan assigned to (JG) | 1/10/2020 | 1/10/2020 | 3/19/2020 | | PASS |
Javier Guzman
|
|
|
03/24 3rd rev - 502 Franklin Warehouse Bldg #2
|
Routing - PLAN CHECK | 3/18/2020 | | 3/19/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 3/18/2020 | | 3/19/2020 | | PASS |
Ethan Mansfield
|
|
|
signed off in eplan by Planning Ethan Mansfield
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/19/2020 | | DONE |
|
|
|
ALL MET (jnorton@jwci.com and ryan@larsonarchitects.biz)
GC
REV VALUES
ACHD
|
Routing - PLAN CHECK | 3/5/2020 | | 3/18/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Drainage | 3/5/2020 | | 3/12/2020 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 3/11/2020 | | 3/11/2020 | | PASS |
Ethan Mansfield
|
|
|
ROS has been recorded and finalized
|
Route to Impact Fee Review | 2/20/2020 | 2/23/2020 | 2/21/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 1/10/2020 | 1/10/2020 | 2/20/2020 | | PASS |
Greg Ruxton
|
|
|
Comments attached to case.
|
Routing Off Site - STRUCTURAL | 1/10/2020 | | 2/20/2020 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by KPFF
|
Routing - PLAN CHECK | 1/10/2020 | | 2/20/2020 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 2/20/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLANNING | 1/10/2020 | | 1/22/2020 | | FAIL |
Ethan Mansfield
|
|
|
The Record of Survey- Property Line Adjustment must be finalized before signing off on building permit.
|
Routing PW Drainage | 1/10/2020 | | 1/21/2020 | | FAIL |
Brian Murphy
|
|
|
MTI REPORT SAYS INFILTRATION TESTING REQURIED APENDX J GRADES
|
Routing - MECHANICAL | 1/10/2020 | | 1/17/2020 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 1/10/2020 | | 1/16/2020 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLUMBING | 1/10/2020 | | 1/14/2020 | | PASS |
Daryl Spivey
|
|
|
Shell only, Plumbing fixtures to come with future T/I.
|
Routing - Design Review | 1/10/2020 | | 1/13/2020 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Solid Waste | 1/10/2020 | | 1/13/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 1/10/2020 | | 1/13/2020 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Street Lights | 1/10/2020 | | 1/13/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing - Addressing | 1/10/2020 | | 1/10/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/10/2020 | | 1/10/2020 | | PASS |
Morgan Webb
|
|
|
SHELL ONLY, PLUMBING FIXTURES TO COME WITH FUTURE TI.
|
Routing - Erosion and Sediment | 1/10/2020 | | 1/10/2020 | | PASS |
Michael Zawacki
|
|
|
Site prep required.
|
Intake Approval | | | 1/10/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 1/7/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per checklist provide a signed and approved by PDS Subdivision Staff Verification of Legal Lot or Parcel form
• Per checklist Provide site specific fire flow at hydrants letter from Suez Water or other public water provider
• Per checklist Provide DR/Planning & Zoning letters of approval.
• Per checklist provide a Landscape Plan showing location of trees, shrubs, groundcovers
• Per checklist provide a Plant Schedule identifying type of vegetation, quantity and size
• Per checklist Provide Erosion & Sediment Control (ESC) Narrative - Narrative must be designed for the specific project and be prepared and signed by a plan designer certified by Boise City.
• Per checklist Provide ESC Plans designed for the specific project and be prepared and signed by a plan designer certified by Boise City. If the ESC plans are found within the ESC narrative copy the ESC plan only (not the whole narrative) and upload it into the drawing file.
• Per checklist provide Electrical plans stamped, signed and dated by an Idaho licensed engineer to view Exit Signs and Emergency Lighting, to view Lighting Plan and Fixture Schedule, to view power plans, to view electrical fixture and equipment schedule, to view panel load summery, to view one-line diagram, to view electrical details and notes.
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet S0.1, S4.1, see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Per checklist provide a Lighting Compliance (COMcheck signed & printed on the plans)
|
Intake Approval | | | 12/31/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen upload the following:
• Upload a completed Checklist 502
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked, and all plan page numbers are listed.
• Incomplete submittals will not be accepted. Applicants with incomplete submittals must upload additional documents
• 502 Checklist can be found at https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/commercial-construction-500/502-new-commercial-and-commercial-additions/
|
Application received | | | 12/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 30 2019 4:21PM
|
Routing - PLANNING | 3/5/2020 | | | | FAIL |
Ethan Mansfield
|
|
|
Waiting for Land Records Parcel Activity form from Surveyor. Cannot approve until this is submitted.
|