BLD-Foundation | 8/10/2020 | 8/11/2020 | 8/11/2020 | P | PART |
Tell Riley
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate //work in progress....adding 2nd bar for 2 bars in top of wall, cutting verts for clearance//
|
BLD-Footing | 8/9/2020 | 8/10/2020 | 8/10/2020 | A | PART |
Tell Riley
|
|
|
Phone #: 6971241 >> Inspection requested via mobile web by Heron //footings ok,, setbacks ok on sides and front//rear has a 1' pop out into setback, talked with contractor on phone, they will be deleting the popout, a plan modification will be completed//WIP on footings and rear pending plan modification approval//
|
BLD-Footing | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | CANC |
Tell Riley
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by heron Inspection cancelled via mobile web on Friday, August 07, 2020.
|
BLD-Footing | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | FAIL |
Tell Riley
|
|
|
need small documents and form 310 for special inspections//site plan shows rear setback of 10 feet minimum, current site conditions set at 8'//talked with general contractor, will need to submit for 8' setback or meet minimums on site plan A101//
|
Plan assigned to (M_H) | 2/11/2020 | | 7/21/2020 | | DONE |
Michael Hanson
|
|
|
3rd review completed - 03/18 #502 L3 ePlan - Todd Campbell Office Bldg
|
BLD-Other | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | CANC |
Brandon Shaw
|
|
|
Erosion inspection Phone #: ###-#### Inspection requested via web by Todd Campbell
|
Issue PAID IN FULL permit | | | 7/13/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/1/2020 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/29/2020 | | 7/1/2020 | | PASS |
Michael Hanson
|
|
|
AHJ
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 7/1/2020 | | DONE |
|
|
|
ALL MET Dean Waite
ACHD
GC Form
Revised Cert of Value
met: RP
|
Routing Off Site - STRUCTURAL | 6/2/2020 | | 6/9/2020 | | FAIL |
Michael Hanson
|
|
|
AHJ
|
Routing - FIRE | 6/4/2020 | 6/4/2020 | 6/4/2020 | | PASS |
Greg Ruxton
|
|
|
Attached comments to case.
|
Routing PW Drainage | 5/22/2020 | | 5/22/2020 | | PASS |
Brian Murphy
|
|
|
existing pad siteparking lots,stormwater system commercial sub approval
|
Routing Off Site - STRUCTURAL | 5/13/2020 | | 5/22/2020 | | FAIL |
Michael Hanson
|
|
|
AHJ
|
Routing - FIRE | 5/15/2020 | 5/15/2020 | 5/15/2020 | | FAIL |
Greg Ruxton
|
|
|
Attached comments to case and emailed architect.
|
Routing - Design Review | 5/14/2020 | | 5/14/2020 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00471
|
Routing - PLANNING | 5/14/2020 | | 5/14/2020 | | PASS |
Nicolette Womack
|
|
|
|
Route to Impact Fee Review | 3/25/2020 | 3/28/2020 | 3/26/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 3/25/2020 | | FAIL |
Michael Hanson
|
|
|
|
Routing - FIRE | 2/11/2020 | 2/11/2020 | 3/24/2020 | | FAIL |
Greg Ruxton
|
|
|
Attached comments to case and emailed architect. GR
|
Routing Off Site - STRUCTURAL | 2/11/2020 | | 3/23/2020 | | FAIL |
Michael Hanson
|
|
|
AHJ
|
Routing - PLAN CHECK | 2/11/2020 | | 3/23/2020 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Drainage | 2/12/2020 | | 2/21/2020 | | FAIL |
|
|
|
NEED DRAINAGE REPORT OAND M APNDX J
|
Routing PW Environmental | 2/12/2020 | | 2/18/2020 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 2/11/2020 | | 2/14/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing PW Solid Waste | 2/12/2020 | | 2/13/2020 | | PASS |
Evan Carpenter
|
|
|
Sharing solid waste service with the property to the east.
|
Routing PW Street Lights | 2/12/2020 | | 2/13/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 2/12/2020 | | 2/12/2020 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Design Review | 2/11/2020 | | 2/12/2020 | | FAIL |
KayCee Babb
|
|
|
Submittal did not comply with conditions of approval of DRH19-00471. Cross access/shared parking agreement needs to be provided. Landscape plan needs to show proposed and existing trees to verify plan compliance. Accessible parking stall/ramp needs to be the same on all plans.
|
Routing - Addressing | 2/11/2020 | | 2/12/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/11/2020 | | 2/12/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - PLUMBING | 2/11/2020 | | 2/12/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - PLANNING | 2/11/2020 | | 2/11/2020 | | FAIL |
Nicolette Womack
|
|
|
As conditioned by DR, required to provide a shared parking agreement.
|
Routing - Erosion and Sediment | 2/11/2020 | | 2/11/2020 | | PASS |
Michael Zawacki
|
|
|
RP needed. Site prep required. Plan ok due to nonenviromental location.
|
Intake Approval | | | 2/6/2020 | | PASS |
Michael Hanson
|
|
|
|
Intake Approval | | | 1/27/2020 | | FAIL |
Michael Hanson
|
|
|
01/22/2020
See red mark ups that are now clouded as unresolved on the 502 checklist for corrections required to pass prescreen.
|
Intake Approval | | | 1/7/2020 | | FAIL |
Michael Hanson
|
|
|
See red mark ups on 502 checklist provided.
|
Application received | | | 12/31/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 31 2019 10:43AM
|