Permit Information
Permit NumberBLD20-00026
StatusIssued
Name ESI
Site Address 1575 S FIVE MILE RD
Project NameChase Bank new building
Customer Number 
ePlanReviewYes
Description
(CHASE BANK - NEW BUILDING) //PLAN MOD TO SUBMIT UPDATED MECHANICAL AND ELECTRICAL PLANS. // Permit to construct a new commercial building 3,350 sqft. for use as a bank. Work to include: construction of footing foundation, slab on grade concrete floor, construction of metal stud framed exterior envelope walls, low slope wood truss roof construction, interior non-bearing walls, 2 accessible restrooms, windows and accessible doors, new electrical, new mechanical, new plumbing, site work, and interior finishes. Interior finishes to be in compliance with Ch. 8 of the 2015 IBC. Structural engineering provided. Approval is contingent on adhering to approved plans, building plan review report, notations, engineering, local codes and ordinances. **MDH**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance8/11/20208/12/20208/12/2020APASS
DetailsMike Jordan
interior wall insulation to cover Phone #: ###-#### Inspection requested via web by todd smock
BLD-Framing/Rough-in8/11/20208/12/20208/12/2020APASS
DetailsMike Jordan
joist engineering and missed a34/lu hangers installed. Phone #: ###-#### Inspection requested via web by todd smock. Fireblocking has been installed.
BLD-Framing/Rough-in8/7/20208/10/20208/10/2020APASS
DetailsMike Jordan
Interior Wall rough in complete to sheet rock 1 side Phone #: ###-#### Inspection requested via web by todd smock. Ok to one side. Needs to complterte fireblocking.
BLD-Energy code compliance8/3/20208/5/20208/5/2020APASS
DetailsMike Jordan
Inspection requested for Exterior Wall Inspection to Cover Phone #: ###-#### Inspection requested via web by todd smock. Ok to sheet rock exterior walls only.
BLD-Framing/Rough-in8/5/20208/5/20208/5/2020APART
DetailsMike Jordan
Inspection requested for Exterior Wall Inspection to Cover Phone #: ###-#### Inspection requested via web by todd smock. Needs to complete lateral bracing on trusses, fire block furred walls and provide engineering from truss co. showing addditional load on bottom chord for added soffits ok.
BLD-Framing/Rough-in7/31/20208/3/20208/3/2020APART
DetailsMike Jordan
exterior wall electrical passed and need to insulate and rock monday. Phone #: ###-#### Inspection requested via web by todd smock. Ok to insulate exterior walls only. Needs to provide strap at double top plate break at plumbing penetration for roof drain. Needs to provide truss engineering on energy code inspection.
BLD-Framing/Rough-in7/27/20207/28/20207/28/2020PNR
DetailsMike Jordan
walls are all roughed in per inspectors request to gain framing completion Phone #: ###-#### Inspection requested via web by todd smock
CHANGE STATUS TO (ISS)  7/27/2020 DONE
Plan Mod issued
OVERRIDE  7/23/2020  
Routing - PLAN CHECK7/23/2020 7/23/2020 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/23/2020 DONE
DetailsMichael Hanson
Permit Ready to Issue  7/23/2020 DONE
Plan Mod - MET
Plan assigned to (M_H)7/8/2020 7/23/2020 DONE
DetailsMichael Hanson
07/22 plan mod - Chase bank
BLD-Framing/Rough-in7/20/20207/21/20207/21/2020APASS
DetailsMike Jordan
SCREENED // Todd Phone #: ###-####. Ok to cover exterior sheathing and roof.
BLD-Wall Bracing7/15/20207/17/20207/17/2020APART
DetailsMike Jordan
Todd - */Screened*/ Phone #: ###-####. Work in progress. Needs to install straps, holdowns and strap on roof. Will reschedule.
Plan Modification Accepted  7/8/2020 DONE
Interior revisions per latest client standards.
BLD-Concrete6/19/20206/22/20206/22/2020APART
DetailsMike Jordan
slab placement, bar, rigid insulation and vapor barrier special inspections. City for flatwork and inlets. Phone #: ###-#### Inspection requested via web by todd smock. Work in progress on installing reinforcement. Noted missed reinforcement from top of grade beam into slab. Will need RFI from engineer fro repair.
BLD-Footing6/15/20206/16/20206/16/2020ACANC
DetailsMike Jordan
rigid insulation interior stem wall Phone #: ###-#### Inspection requested via web by todd smock
BLD-Energy code compliance6/16/20206/16/20206/16/2020APASS
DetailsMike Jordan
rigid insulation interior stem wall Phone #: ###-#### Inspection requested via web by todd smock
BLD-Grading Inspection6/11/20206/11/20206/11/2020PCANC
DetailsMike Jordan
Require city inspection of seepage bed, engineer will sign off on this as well when onsite Phone #: ###-#### Inspection requested via web by todd smock. Needs to contact public Works.
BLD-Footing6/4/20206/8/20206/8/2020APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Tim Freer. Perimeter footings, will have special inspection. Needs to provide vertical reinforcement at 16 oc,
Plan assigned to (M_H)5/22/2020 6/8/2020 DONE
DetailsMichael Hanson
06/05 Plan Mod - Chase Bank revisions and ACHD standards
No review conducted. MH 06/08
CHANGE STATUS TO (ISS)  5/27/2020 DONE
will apply for plan mod at a better date. see email in documents
Plan Modification Accepted  5/22/2020 DONE
******applicant no longer following through and delete the plan assigned to task 5-27-2020********

Plan Modification for interior revisions and corrections based on ACHD standards
Issue PAID IN FULL permit  5/4/2020 DONE
Print Occupancy Form  5/4/2020 DONE
Telephone call  5/1/2020 DONE
Let contractor know via email that we still need an RP and fees to be paid before we can issue
OVERRIDE  4/30/2020  
Permit Ready to Issue  4/30/2020 DONE
met
NEED
RP
MET ACHD
MET GC
MET Revised Certificate of Value
Plan assigned to (M_H)1/21/2020 4/29/2020 DONE
DetailsMichael Hanson
1st review completed - 02/21 #502 L3 ePlan - Chase Bank
Routing PW Drainage4/29/2020 4/29/2020 FAIL
DetailsJason C. Taylor
Need signed and notarized appendix J. Jason Taylor ###-####
Routing Off Site - A.C.H.D4/29/2020 4/29/2020 PASS
DetailsMichael Hanson
See attached approval letter.
Routing PW Drainage4/29/2020 4/29/2020 PASS
DetailsJason C. Taylor
Routing Off Site - STRUCTURAL3/18/2020 4/21/2020 PASS
DetailsMichael Hanson
per ePlan approval by AHJ engineering
Routing PW Sewer Design4/6/2020 4/6/2020 PASS
DetailsDeAnn Brown
Routing PW Sewer Design4/6/2020 4/6/2020 PASS
DetailsDeAnn Brown
Routing - PLUMBING4/3/2020 4/3/2020 PASS
DetailsDaryl Spivey
See redline note P2. If RPBP is installed adequate drainage shall be installed to accomodate it. DCVA is an approved device for service protection.
Routing - FIRE3/27/20203/27/20203/27/2020 PASS
DetailsGreg Ruxton
Comments attached to case.
Routing PW Drainage3/25/2020 3/25/2020 FAIL
DetailsJason C. Taylor
See changemarks in ePlan.
Routing PW Solid Waste3/19/2020 3/19/2020 PASS
DetailsEvan Carpenter
Routing - Design Review3/18/2020 3/18/2020 PASS
DetailsKatelyn Menuge
Routing PW Street Lights3/18/2020 3/18/2020 PASS
DetailsTom Marshall
Routing - PLUMBING3/18/2020 3/18/2020 FAIL
DetailsDaryl Spivey
See redline note P2.1. If RPBP is installed adequate drainage must be available for RPBP drain.
2. Changemark note on C5.10 not resolved
Routing - MECHANICAL3/18/2020 3/18/2020 PASS
DetailsTroy James
Route to Impact Fee Review2/26/20202/29/20202/27/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE1/13/20201/21/20202/26/2020 FAIL
DetailsGreg Ruxton
Comments attached to case. Emailed architect.
1st review completed  2/26/2020 FAIL
DetailsMichael Hanson
Routing Off Site - STRUCTURAL1/21/2020 2/24/2020 FAIL
DetailsMichael Hanson
AHJ
Routing - PLAN CHECK1/21/2020 2/24/2020 PASS
DetailsMichael Hanson
Routing - MECHANICAL1/21/2020 1/30/2020 FAIL
DetailsTroy James
Talked to mechanical engineer.
Routing - PLUMBING1/21/2020 1/29/2020 FAIL
DetailsDaryl Spivey
See changemark on C5.10 utility plan
Routing PW Drainage1/21/2020 1/28/2020 FAIL
new pave to existing c.b.
to achd. ground water seperation 5feet to freedraining note need stamp civil and no not for construction
Routing PW Solid Waste1/21/2020 1/27/2020 FAIL
Details
This property is required to provide for solid waste service, unless the company is hauling their own waste to a proper disposal location (e.g., landfill). See the Solid Waste Design Standards for more information.
Routing - Design Review1/21/2020 1/24/2020 FAIL
DetailsKatelyn Menuge
Need six bicycle parking spaces and additional street trees.
Routing - Addressing1/21/2020 1/23/2020 PASS
DetailsDoug Chausow
Routing - Erosion and Sediment1/21/2020 1/23/2020 PASS
DetailsMichael Zawacki
RP needed.
Routing - PUBLIC WORKS1/21/2020 1/22/2020 PASS
DetailsMorgan Webb
Routing PW Street Lights1/21/2020 1/22/2020 FAIL
DetailsTom Marshall
Routing PW Sewer Design1/21/2020 1/22/2020 FAIL
DetailsDeAnn Brown
See changemarks. The existing sewer service line for the lot is a 4", not 8". And some notes do not apply.
Routing - PLANNING1/21/2020 1/22/2020 PASS
DetailsKevin Holmes
Passed, meets requirements of CUP19-00073.
Intake Approval  1/13/2020 PASS
DetailsJenny Nelson
Intake Approval  1/9/2020 FAIL
DetailsJenny Nelson
Please upload sheet M4.0 as indicated on checklist or let me know where heating and cooling load calculations and mechanical ventilation systems are, I couldn't find them.
Intake Approval  1/7/2020 FAIL
DetailsJenny Nelson
1. Filled out submittal checklist
2. Owners signature on 310 Special Inspection Form
Application received  1/3/2020 DONE
Application submitted via PDS Online on Jan 3 2020 12:54PM
Routing PW Sewer Design3/18/2020   FAIL
There is a note on the utility sheet that says the sewer service line for the proposed building is an "EX 8" sanitary sewer line". This pipeline is actually a 4" sewer service pipeline. Please revise this note or remove.