Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD20-00031
StatusIssued
Name KENNETH HOWELL
Site Address 130 E MALLARD DR
Project NamePlaza garage beam repair
Customer Number 
ePlanReviewNo
Description
(PARKLANE PLAZA PARKING GARAGE - BEAM REPAIR) Certificate of completion to be issued upon final inspection approval. Permit for wood beam repairs at the existing parking garage building. Grid F4 beam replacement and Grid K6 beam replacement utilizing steel beams, steel columns and steel foot plates. Approval is contingent on adhering to approved plans and attached structural engineering. This is a repair permit only no fire life safety inspection required. Note: Special inspection are required per engineer of record Craig Brasher **MDH** Referenced previous permits = BLD07-02488 and BLD11-01031.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference8/4/20208/4/20208/4/2020PDEFR
DetailsBrandon Shaw
Correction Notice Posted, requesting a conference...
BLD-Conference5/22/20205/22/20205/22/2020PCANC
DetailsBrandon Shaw
Jason Phone #: ###-####
BLD-Conference5/15/20205/18/20205/18/2020APASS
DetailsBrandon Shaw
Status?
Issue PAID IN FULL permit  2/12/2020 DONE
Plan resubmittals received  2/11/2020 DONE
Two copies of Structural Cals, two copies of plan sheets S1.1, S1.2, S2.1 and S3.1 taken to Michael
PLANS/APPL TAKEN TO FRONT DESK  2/11/2020 DONE
DetailsMichael Hanson
Case Summary (BLD)  2/11/2020 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  2/11/2020 DONE
Permit Ready to Issue  2/11/2020 DONE
Need
GC Form (parcel owner is GC, if not we need a revised value)
Telephone call  2/11/2020 DONE
spoke with ken informing him this permit is ready and the fee amount due for issuance
Plan assigned to (M_H)1/3/2020 2/11/2020 DONE
DetailsMichael Hanson
1st review completed - 01/09 #518 L2 Paper - Plaza garage beam repair - pending paper resubmittal
Routing Off Site - STRUCTURAL1/31/2020 2/7/2020 PASS
DetailsMichael Hanson
Stapley engineering
Plan resubmittals received  1/30/2020 DONE
Mike with Parkland dropped off resubmittal. Sheets: S1.1, S1.2, S2.1, and S3.1 as well as supplemental structural calculations
Route to Impact Fee Review1/17/20201/20/20201/21/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - PLAN CHECK1/3/2020 1/17/2020 PASS
DetailsMichael Hanson
Routing Off Site - STRUCTURAL1/3/2020 1/17/2020 FAIL
DetailsMichael Hanson
Stapley engineering
1st review completed  1/17/2020 DONE
DetailsMichael Hanson
Plans ACCEPTED BY PLAN TECH  1/3/2020 DONE
Recd Pcfee & Taken To Pln CK  1/3/2020 DONE
Intake Approval  1/3/2020 PASS
BLD-Conference8/4/20208/14/2020 P 
DetailsBrandon Shaw
Application received 1/3/2020