BLD-Final | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Blower Door Test Results | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | DONE |
Mike Jordan
|
|
|
4.9
|
BLD-Energy code compliance | 3/23/2020 | 3/25/2020 | 3/25/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Mike Jordan
|
|
|
Inspection requested via web by Joel Hirtle
|
BLD-Wall Bracing | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
Fees Due Hold | 2/25/2020 | | 3/5/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/24/2020 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/24/2020 | | DONE |
|
|
|
plan mod for MJ, didnt need to change status
|
Routing - PLAN CHECK | 2/24/2020 | | 2/24/2020 | | PASS |
Brian McGowan
|
|
|
Manual J updated.
|
Permit Ready to Issue | | | 2/24/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/20/2020 | | DONE |
|
|
|
plan mod- manual J
|
Routing - MECHANICAL | 2/20/2020 | | 2/20/2020 | | PASS |
Troy James
|
|
|
manual J plan mod
|
BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/29/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/22/2020 | | |
|
|
|
|
Plan assigned to (BJM) | 1/9/2020 | 1/9/2020 | 1/22/2020 | | DONE |
Brian McGowan
|
|
|
01/22- L1 SFD ePlan
|
Routing - PLAN CHECK | 1/9/2020 | | 1/22/2020 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 1/22/2020 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/22/2020 | | DONE |
|
|
|
MET
|
Routing - MECHANICAL | 1/9/2020 | | 1/14/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/9/2020 | | 1/9/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 1/9/2020 | | 1/9/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/9/2020 | | 1/9/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/9/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/9/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/7/2020 | 1/10/2020 | 1/8/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Intake Approval | | | 1/7/2020 | | FAIL |
|
|
|
Please upload the correct drawings for Lot 12 Block 10. The drawings say Lot 11 Block 10.
The sq ft is different then on the application and plans.
(COULD NOT DO PRESCREEN)
|
Intake Approval | | | 1/7/2020 | | FAIL |
|
|
|
2nd Prescreen- Please upload the correct drawings for LOT 12 BLOCK 10, the drawings say Lot 2 Block 10.
|
Intake Approval | | | 1/7/2020 | | PASS |
|
|
|
|
Application received | | | 1/6/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 6 2020 5:06PM
|