BLD-Footing | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Setbacks ok. A seperate electrical permit is required and inspection for grounding on pool is required prior to cover.
|
OVERRIDE | | | 1/7/2020 | | |
|
|
|
|
Routing Walk-In (Zoning) | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
KayCee Babb
|
|
|
Pool apron permitted to encroach into rear setback so long as apron is a minimum of three feet from property line.
|
Routing Walk-In (BLD) | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/7/2020 | | 1/7/2020 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 1/7/2020 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/7/2020 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 1/7/2020 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/7/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/7/2020 | | DONE |
|
|
|
|
Application received | | 1/7/2020 | | | |
|
|
|
|