Letter of compliance/Occupancy | | | 7/31/2020 | | DONE |
|
|
|
|
BLD-Final | 7/20/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Brandon Shaw
|
|
|
lock box code 7777, located to left of front door, please contact Dean w/ any questions, thank you Phone #: ###-#### Inspection requested via web by Dean Rhodes
|
DOC - Permit Finaled | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PASS |
Brandon Shaw
|
|
|
lock box located on water spigot left of garage doors, thx. Phone #: ###-#### Inspection requested via web by Dean Rhodes
|
BLD-Framing/Rough-in | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to insulate...
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | P | FAIL |
Mike Jordan
|
|
|
requesting framing and air seal inspection. access is lock box code 7777, located to left of garage doors attached to water spigot. Permit located in garage on south wall. Thank you Phone #: ###-#### Inspection requested via web by Dean Rhodes. Fireblock mech. chase at ceiling on main level. Strap double top plate break at new to existing framing by main door. Fire block all fir downs and fir outs in basement. Correction notice posted. Ok to insulate.
|
Routing Walk-In (BLD) | 3/16/2020 | 3/16/2020 | 3/16/2020 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/16/2020 | | 3/16/2020 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/16/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/16/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/16/2020 | | DONE |
|
|
|
adding new door to west side of home
|
BLD-Conference | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | DONE |
Brandon Shaw
|
|
|
Dean- call 45 min prior if possible Phone #: ###-####
|
Routing Walk-In (Zoning) | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Ethan Mansfield
|
|
|
Repair work only. Less than 50% of value was damaged.
|
Routing Walk-In (BLD) | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | DONE |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 1/8/2020 | | 1/8/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLAN CHECK | 1/8/2020 | | 1/8/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/8/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/8/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 1/8/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 1/8/2020 | | DONE |
|
|
|
|
Application received | | 1/8/2020 | | | |
|
|
|
|