BLD-Final | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Dave Hannah
|
|
|
mIKE Phone #: ###-####
|
DOC - Permit Finaled | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Brandon Shaw
|
|
|
Mike Phone #: ###-####
|
Routing Walk-In (BLD) | 1/23/2020 | 1/23/2020 | 1/23/2020 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 1/9/2020 | 1/9/2020 | 1/23/2020 | | PASS |
Josh Bogle
|
|
|
01/15 addition, paper - 1st done
|
Routing - PLAN CHECK | 1/23/2020 | | 1/23/2020 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/23/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 1/23/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 1/23/2020 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/23/2020 | | DONE |
Josh Bogle
|
|
|
applicant brought in an Elevation Certificate - routed to Floodplain
|
Routing PW Flood Plain | 1/23/2020 | | 1/23/2020 | | PASS |
Jason C. Taylor
|
|
|
EC shows structure is out of floodplain. No review required. JCT
|
Routing Walk-In (BLD) | 1/21/2020 | 1/21/2020 | 1/21/2020 | A | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 1/10/2020 | 1/10/2020 | 1/10/2020 | A | FAIL |
Josh Bogle
|
|
|
had a nice chat with Mike
|
1st review completed | | | 1/10/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Flood Plain | 1/9/2020 | | 1/10/2020 | | FAIL |
Jason C. Taylor
|
|
|
need elevation certificate for complance with floodplain code. JCT
|
Routing - PLAN CHECK | 1/9/2020 | | 1/10/2020 | | FAIL |
Josh Bogle
|
|
|
needs Elevation details on plans
|
Routing Walk-In (Zoning) | 1/9/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 1/9/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Application received | | 1/9/2020 | | | |
|
|
|
|