BLD-Final | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Roger Judge//need approved plans onsite//see CN posted for walk through//
|
BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Roger Judge. Needs mech. final.
|
BLD-Framing/Rough-in | 4/19/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Roger Judge//cut joist correction ok//
|
BLD-Energy code compliance | 4/11/2020 | 4/13/2020 | 4/13/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Roger Judge//ok still need to see joist repair//ok to cover partial and will need to call in for joist repair//
|
BLD-Energy code compliance | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Roger Judge//upstairs tub needs vapor barrier and is miising insulation in wall cavity//still need joist fix for cut flanges//
|
BLD-Framing/Rough-in | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Roger Judge//ok to insulate//still need to have joist repairs completed//
|
BLD-Framing/Rough-in | 3/18/2020 | 3/19/2020 | 3/19/2020 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Roger Judge//CN posted//need truss brcing//fix shear wall//fix joist that are cut//fix bearing wall top plate with strap//insulate behind tub//complete air seal//
|
BLD-Conference | 2/3/2020 | 2/4/2020 | 2/4/2020 | P | CANC |
Tell Riley
|
|
|
Canacel steve 2-4-20 steve Phone #: ###-####
|
BLD-Framing/Rough-in | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | FAIL |
Tell Riley
|
|
|
steve - call for access Phone #: ###-####//no trades permits pulled//not able to make contact, not able to leave voicemail//will need trades inspected and passed prior to framing//
|
Issue PAID IN FULL permit | | | 1/17/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 1/9/2020 | 1/9/2020 | 1/14/2020 | | PASS |
Josh Bogle
|
|
|
01/15 fire repair, paper
|
Routing - MECHANICAL | 1/9/2020 | | 1/14/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/14/2020 | | 1/14/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/14/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/14/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/14/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 1/14/2020 | | DONE |
|
|
|
met
|
Telephone call | | | 1/14/2020 | | DONE |
|
|
|
left a message for caleb informing him that this permit is ready and the fee amount due for issuance
|
Routing Walk-In (Zoning) | 1/9/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 1/9/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Application received | | 1/9/2020 | | | |
|
|
|
|