BLD-Final | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Dave Hannah
|
|
|
Back filled per Engineering...
|
DOC - Permit Finaled | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | CANC |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | DONE |
Brandon Shaw
|
|
|
See documents for special inspection, date 2/13/20... OK to back fill, call for final...
|
BLD-Footing | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | NH |
Brandon Shaw
|
|
|
As per phone conversation- need both ends of footing dug out to verify footing dimentions are as per plans... Need Special inspection for as built footings and foundation, X-ray/ultra-sound to verify rebar is as per Engineering...
|
BLD-Footing | 1/27/2020 | 1/28/2020 | 1/28/2020 | P | PART |
Bob Archibald
|
|
|
John- Phone #: ###-####. Geotech received by PW. Footing and wall placed. No approved plans.
|
BLD-Footing | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | FAIL |
Brandon Shaw
|
|
|
See MIS19-00406 SWO... No Permit, Engineering, or city approved plans on site... Footings and foundation already poured and backfilled... Need Engineer of Record approval...
|
Telephone call | | | 1/27/2020 | | DONE |
|
|
|
emailed a request for a copy of the signed permit. The permit was picked up in person, but the scan failed.
|
Issue PAID IN FULL permit | | | 1/27/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 1/14/2020 | 1/14/2020 | 1/24/2020 | | PASS |
Josh Bogle
|
|
|
01/17 retaining wall, paper
|
Routing - PLAN CHECK | 1/14/2020 | | 1/24/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 1/23/2020 | | 1/24/2020 | | PASS |
Andy J. Long
|
|
|
No new disturbance, replacement of existing wall. Spoke with Modern Concrete about pollution prevention requirements even when no ESC permit is required.
|
1st review completed | | | 1/24/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/24/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/24/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 1/24/2020 | | DONE |
|
|
|
NEED
GC- *the RCE/RCT on the application does not come up on the IBOL as the name of the company on the application**
|
Routing - PUBLIC WORKS | 1/22/2020 | | 1/22/2020 | | PASS |
Morgan Webb
|
|
|
|
PubWorks Subgrade Approval | 1/21/2020 | 1/21/2020 | 1/21/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Routing PW Grading-Hillside | 1/14/2020 | | 1/21/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (Zoning) | 1/14/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Jeff Lowe
|
|
|
this is the replacement of an exisitng wall that was failing. there was and is a new fecne that is offset from the wall. this is considered maintenance due to the failure. there is a recorded easement attached to this permit allowing work to be done on properties.
|
Routing Walk-In (BLD) | 1/14/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Josh Bogle
|
|
|
took in as for level two review
|
Routing Walk-In (Zoning) | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Routing Walk-In (Zoning) | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | FAIL |
Jeff Lowe
|
|
|
the wall is for a replacement wall that crosses the common side property line. it is presumed that the adjacent owner does not know that work is being done on their property. both parties need to agree to allow work and both parties should have an easement agreement. it would appear that a metes and bounds moved the property lines and then a ROS (7905) was recorded to delienate said M&B.
|
Application received | | 1/10/2020 | | | |
|
|
|
|