Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD20-00113
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5833 E FOXGROVE DR
Project NameLOT 22 BLOCK 2 HARRIS NORTH #3
Customer Number 
ePlanReviewYes
Description
***W.U.I. FOOTHILLS LOT ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED*** Permit for the construction of a new 3322 sq. ft., two story (first story 2374 sq. ft., second story 948 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 382 sq. ft. of covered patio/porch and a 1052 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning.***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20207/31/20207/31/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled7/31/20207/31/20207/31/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/31/20207/31/20207/31/2020ADONE
DetailsBrandon Shaw
ACH50- 4.36
PubWorks Occupancy Approval7/13/20207/13/20207/13/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
BLD-Other4/15/20204/15/20204/15/2020PPASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance4/14/20204/15/20204/15/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kyle Seick soffits look ok to
BLD-Framing/Rough-in4/13/20204/13/20204/13/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing3/19/20203/20/20203/20/2020APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other3/17/20203/18/20203/18/2020PFAIL
DetailsTell Riley
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick//needed shear//CN posted//need hold downs, finsish nailing// hot dip nails in PT//
BLD-Foundation2/27/20202/27/20202/27/2020PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing2/26/20202/26/20202/26/2020PPASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval2/26/20202/26/20202/26/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
OVERRIDE  2/18/2020  
Plan assigned to (RDP)1/22/20201/22/20202/18/2020 DONE
DetailsRob Patrick
02/10 sfd L2 ePlan...Failed but waiting for Hillside review
Issue PAID IN FULL permit  2/18/2020 DONE
Inspection Record Card- Bld  2/18/2020 DONE
1st review completed  2/18/2020 FAIL
DetailsRob Patrick
Routing - PLAN CHECK2/18/2020 2/18/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/18/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  2/18/2020 DONE
All Met
Routing PW Grading-Hillside2/10/2020 2/13/2020 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Plan Reviewer's activity  2/10/2020  
DetailsRob Patrick
Failed but waiting for Hillside to review.
Routing - PLAN CHECK1/22/2020 2/10/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Route to Impact Fee Review1/22/20201/25/20201/23/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL1/22/2020 1/23/2020 PASS
DetailsChad Schwendiman
Routing - PLANNING1/22/2020 1/22/2020 PASS
DetailsSue Cummings
Routing - Addressing1/22/2020 1/22/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/22/2020 1/22/2020 PASS
DetailsCandy A. Nichols
Plans ACCEPTED BY PLAN TECH  1/22/2020 DONE
Recd Pcfee & Taken To Pln CK  1/22/2020 DONE
Intake Approval  1/22/2020 PASS
Application received  1/14/2020 DONE
Application submitted via PDS Online on Jan 14 2020 8:17AM