BLD-Final | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Mike Jordan
|
|
|
Call for access Phone #: ###-#### Inspection requested via web by Allen Jones
|
DOC - Permit Finaled | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | DONE |
Mike Jordan
|
|
|
5.6
|
BLD-Final | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | FAIL |
Mike Jordan
|
|
|
Call for Access Phone #: ###-#### Inspection requested via web by Allen Jones. Needs MEP finals and firecaulk penetrations in garage.
|
BLD-Framing/Rough-in | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | PASS |
Mike Jordan
|
|
|
Plans in House Phone #: ###-#### Inspection requested via web by Allen Jones. patio framing ok.
|
BLD-Framing/Rough-in | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | NR |
Mike Jordan
|
|
|
Rear Patio Plan Mod Phone #: ###-#### Inspection requested via web by Allen Jones. Provide larger framing plan, glue lam appears to nave insufficient bearing, 2x8 ledger?
|
(F) Reprint permit | | | 5/11/2020 | | DONE |
|
|
|
|
BLD-Footing | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Mike Jordan
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Framing/Rough-in | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | CANC |
Mike Jordan
|
|
|
allan Phone #: ###-####
|
BLD-Energy code compliance | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Mike Jordan
|
|
|
allan Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/27/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/24/2020 | | |
|
|
|
|
BLD-Framing/Rough-in | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | PASS |
Mike Jordan
|
|
|
Allen Phone #: ###-####
|
Plan assigned to (D_S) Debbie | 3/19/2020 | 3/19/2020 | 3/24/2020 | | DONE |
Debbie Sanine
|
|
|
3/25/20 sfd L1 ePlan - Plan mod for covered patio - pending planning review
|
Routing - PLANNING | 3/19/2020 | | 3/24/2020 | | PASS |
Crystal Rain
|
|
|
|
Permit Ready to Issue | | | 3/24/2020 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
BLD-Energy code compliance | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | CANC |
Mike Jordan
|
|
|
Air Seal - Jack Phone #: ###-####
|
Plan Reviewer's activity | | | 3/20/2020 | | DONE |
Debbie Sanine
|
|
|
No residential plan mod review fee
|
Plan Modification Accepted | | | 3/19/2020 | | DONE |
|
|
|
Allen Jones from Hayden Homes emailed requesting a plan mod for patio engineering.
|
Routing - PLAN CHECK | 3/19/2020 | | 3/19/2020 | | PASS |
Debbie Sanine
|
|
|
|
BLD-Wall Bracing | 3/11/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Mike Jordan
|
|
|
Louis Phone #: ###-####
|
BLD-Foundation | 2/18/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Mike Jordan
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Mike Jordan
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Conference | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | CANC |
Mike Jordan
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Tuesday, February 18, 2020.
|
BLD-Footing | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | FAIL |
Mike Jordan
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell. Footing subgrade is frozen at this time
|
OVERRIDE | | | 2/13/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 2/6/2020 | 2/6/2020 | 2/13/2020 | | DONE |
Debbie Sanine
|
|
|
|
Plan Reviewer's activity | | | 2/13/2020 | | DONE |
Debbie Sanine
|
|
|
Covered patio to come in as a plan mod and will not be built until engineering calculations are submitted, in a couple of weeks.
|
Routing - PLAN CHECK | 2/13/2020 | | 2/13/2020 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/13/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 2/13/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/13/2020 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/12/2020 | | DONE |
Debbie Sanine
|
|
|
Hayden resubmitted without attaching signed & stamped eng. calculations. Requested they email to me, and I can upload into ePlan.
|
1st review completed | | | 2/10/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 1/28/2020 | | 2/10/2020 | | FAIL |
Jenny Nelson
|
|
|
Per D_S review
|
Plan assigned to (J_N) | 1/28/2020 | 1/28/2020 | 2/6/2020 | | DEFR |
Jenny Nelson
|
|
|
02/10 sfd L1 ePlan
|
Routing - PLANNING | 1/28/2020 | | 1/30/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - Addressing | 1/28/2020 | | 1/30/2020 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 1/28/2020 | 1/31/2020 | 1/29/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 1/28/2020 | | 1/29/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - MECHANICAL | 1/28/2020 | | 1/29/2020 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/28/2020 | | DONE |
|
|
|
|
Intake Approval | | | 1/28/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/28/2020 | | DONE |
|
|
|
|
Application received | | | 1/14/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 14 2020 10:20AM
|
Intake Approval | | | 1/14/2020 | | FAIL |
|
|
|
Deleted the drawings that were submitted, (wrong size and couldn't view)
1st Prescreen- FULL PRESCREEN WAS NOT BE DONE DO TO SIZE OF PLANS
1. Plans must be uploaded as individual sheets
2. Drawing file names must include the first characters of the discipline name, followed by the sheet number and name. Example: A2.0_Floor Plan
3. Full prescreen was not done due to the size of the plans, therefor there could be other things missing. Please refer to our EPlanReview Plan Submittal Standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|