BLD-Blower Door Test Results | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | CANC |
Tell Riley
|
|
|
4.38 ACH 50
|
BLD-Final | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Tell Riley
|
|
|
Front door is open Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
DOC - Permit Finaled | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 5/27/2020 | 5/28/2020 | 5/28/2020 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final.
|
BLD-Energy code compliance | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PASS |
Mike Jordan
|
|
|
Areas in draft stop have been sealed with fire foam. Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Energy code compliance | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Still needs to seal penetrations in draft stop.
|
BLD-Framing/Rough-in | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 4/1/2020 | 4/3/2020 | 4/3/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail C3G 2ply per the engineering. Provide additional 2x studs under 2ply in garage, both ends. Seal all penetrations in draft stop and complete portion under stairs. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Mike Jordan
|
|
|
unknown caller Phone #: ###-####
|
Routing - MECHANICAL | 3/4/2020 | | 3/5/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
Plan Modification Accepted | | | 3/3/2020 | | DONE |
|
|
|
Plan Mod Manual J per CBH Homes Gloria Martinez
|
BLD-Foundation | 2/25/2020 | 2/26/2020 | 2/26/2020 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 2/24/2020 | 2/25/2020 | 2/25/2020 | P | PART |
Mike Jordan
|
|
|
Jerry Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/5/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/4/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 1/30/2020 | 1/30/2020 | 2/4/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 1/30/2020 | | 2/4/2020 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 2/4/2020 | | DONE |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/4/2020 | | DONE |
|
|
|
met
|
Route to Impact Fee Review | 1/30/2020 | 2/2/2020 | 1/31/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 1/30/2020 | | 1/31/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/30/2020 | | 1/31/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 1/30/2020 | | 1/31/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/30/2020 | | 1/31/2020 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/30/2020 | | DONE |
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
|
|
|
|
Intake Approval | | | 1/17/2020 | | FAIL |
|
|
|
Please refill out the sq ft on your application and upload again so it versions over.
Manual does not math the lot and block
|
Application received | | | 1/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2020 3:16PM
|