Permit Information
Permit NumberBLD20-00151
StatusFinaled
Name CBH HOMES
Site Address 10008 W CAMPVILLE ST
Project NameLOT 28 BLK 01 UNION SQUARE SUB
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2636 sq. ft., two story (first story 1166 sq. ft., second story 1470 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 46 sq. ft. of covered patio/porch and a 656 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-2D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/27/20205/28/20205/28/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled5/28/20205/28/20205/28/2020PPASS
DetailsMike Jordan
BLD-Final5/22/20205/22/20205/22/2020PFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Joel Hirtle/CN posted for sill less than 24" in bedroom above garage//need opening limit device IRC 312.2.1 ASTM 2090
BLD-Energy code compliance4/1/20204/3/20204/3/2020APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in4/1/20204/3/20204/3/2020APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. All issues have been resolved.
BLD-Framing/Rough-in3/27/20204/1/20204/1/2020PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Attic acces required in garage. Seal all penetrations in draft stop. Nail off all simpson hangars. (upstairs). Roll block floor joist at interior bearing walls and over main entry. Ok to insulate. Correction notice posted.
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech. and electrical rough in in inspections.
BLD-Wall Bracing3/16/20203/17/20203/17/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
Routing - MECHANICAL3/4/2020 3/4/2020 PASS
DetailsTroy James
Resubmitted manual j report
Plan Modification Accepted  3/3/2020 DONE
Plan Mod Manual J per CBH Homes Gloria Martinez
BLD-Foundation2/20/20202/21/20202/21/2020PPASS
DetailsMike Jordan
Jerry Phone #: ###-####
BLD-Footing2/19/20202/20/20202/20/2020PPASS
DetailsMike Jordan
Dane Phone #: 28-###-####
Issue PAID IN FULL permit  2/3/2020 DONE
Inspection Record Card- Bld  2/3/2020 DONE
OVERRIDE  1/28/2020  
Plan assigned to (RDP)1/22/20201/22/20201/28/2020 DONE
DetailsRob Patrick
02/04 sfd L1 ePlan
Routing - PLAN CHECK1/22/2020 1/28/2020 PASS
DetailsRob Patrick
Routing - PLANNING1/22/2020 1/28/2020 PASS
DetailsSue Cummings
1st review completed  1/28/2020 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  1/28/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  1/28/2020 DONE
Routing - MECHANICAL1/22/2020 1/24/2020 PASS
DetailsChad Schwendiman
Route to Impact Fee Review1/22/20201/25/20201/23/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - Addressing1/22/2020 1/22/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/22/2020 1/22/2020 PASS
DetailsCandy A. Nichols
Plans ACCEPTED BY PLAN TECH  1/22/2020 DONE
Recd Pcfee & Taken To Pln CK  1/22/2020 DONE
Intake Approval  1/22/2020 PASS
Intake Approval  1/17/2020 FAIL
sqft doesn't match
Application received  1/16/2020 DONE
Application submitted via PDS Online on Jan 16 2020 3:23PM