BLD-Framing/Rough-in | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Brandon Shaw
|
|
|
Insulation, OK to cover...
|
BLD-Energy code compliance | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Brandon Shaw
|
|
|
Framing and air seal OK to insulate...
|
BLD-Wall Bracing | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PASS |
Brandon Shaw
|
|
|
screened- no need for inspector to enter home, access through the drive way- Janel Phone #: ###-####
|
BLD-Foundation | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PART |
Tony Young
|
|
|
Cameron Phone #: ###-####,, monolithic foundation ok
|
Routing Walk-In (Zoning) | 1/17/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 1/17/2020 | | 1/17/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/17/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/17/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/17/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 1/17/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/17/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 1/17/2020 | | 1/17/2020 | A | DONE |
Josh Bogle
|
|
|
|
Application received | | 1/17/2020 | | | |
|
|
|
|