First Notice | 7/21/2020 | 7/21/2020 | 8/10/2020 | | DONE |
Brandon Shaw
|
|
|
mailed 8-14-2020
|
BLD-Final | 7/20/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Brandon Shaw
|
|
|
SCREENED // Oliver Phone #: ###-####
|
DOC - Permit Finaled | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
Permanent Occupancy | | | 7/21/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/20/2020 | | DONE |
|
|
|
not sure why in FNL contractor called in for final inspection 7-20-2020
|
FIRE-Final Inspection | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is placed with current inspection tag. Final life fire safety inspection for area of work is complete, signature provided on permit sign off card.
Screened- ODIE Phone #: ###-####
|
BLD-Framing/Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Brandon Shaw
|
|
|
Wall bracing, OK to cover exterior only...
|
Print Occupancy Form | | | 4/28/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/7/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/7/2020 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2020 | | DONE |
|
|
|
email permits and inspection card- Eplan needs to be release
|
OVERRIDE | | | 4/2/2020 | | |
|
|
|
|
Plan assigned to (CDM) | 3/26/2020 | 3/26/2020 | 4/2/2020 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2020 | | DONE |
|
|
|
all met: DScovel@haydenbeverage.com; christine@brsarchitects.com
Need
RP
GC Form
Revised Cert of Value
|
Routing Off Site - STRUCTURAL | 3/26/2020 | | 4/2/2020 | | PASS |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 3/25/2020 | 3/28/2020 | 3/26/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (BJM) | 1/31/2020 | 1/31/2020 | 3/26/2020 | | DEFR |
Brian McGowan
|
|
|
03/11 - 502 Hayden Beverage Picnic Pavilion
|
Routing - PLAN CHECK | 3/26/2020 | | 3/26/2020 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/31/2020 | | 3/25/2020 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 3/25/2020 | | DONE |
|
|
|
|
Routing - FIRE | 1/31/2020 | 1/31/2020 | 3/12/2020 | | PASS |
Erika Akin
|
|
|
No comments attached. Inspector to field verify fire extinguisher within 75 foot travel distance.
|
Routing PW Grading-Hillside | 1/31/2020 | | 2/13/2020 | | PASS |
Melissa Jannusch
|
|
|
No additional hillside requirements.
|
Routing - PLANNING | 1/31/2020 | | 2/5/2020 | | PASS |
David Moser
|
|
|
See DRH19-00446
|
Routing - PLUMBING | 1/31/2020 | | 2/4/2020 | | PASS |
Dan Ediger
|
|
|
Per plans and the ISPC
|
Routing - Erosion and Sediment | 1/31/2020 | | 2/3/2020 | | PASS |
Michael Zawacki
|
|
|
RP needed
|
Routing - Addressing | 1/31/2020 | | 2/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 1/31/2020 | | 2/3/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Design Review | 1/31/2020 | | 1/31/2020 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00446
|
Routing - PUBLIC WORKS | 1/31/2020 | | 1/31/2020 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
Joe Bruce
|
|
|
|
Intake Approval | | | 1/23/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet SD1.0, all MB sheets see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
(regarding the MB sheets we have allowed placing such sheet on an architectural plan sheet so that the reserved bottom corner for the city stamp is accomplished)
• Per checklist provide the Drainage System Operation & Maintenance Plan Stamped and signed by an Idaho licensed design professional.
• Per checklist provide mechanical & plumbing plans stamped and signed by Idaho licensed engineers or provide an email transcript from mechanical supervisor Chad Schwendiman and Plumbing supervisor Dan Ediger stating NO engineered plan are required.
|
Application received | | | 1/22/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 22 2020 10:19AM
|
Second Notice | | 8/20/2020 | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/31/2020 | | | | FAIL |
Brian McGowan
|
|
|
AHJ
|